Avanti had 2,128 scheduled stops at Lockerbie in the 13 periods to Period 7 of 2026-27, 15% of the station's total. 53.1% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
Avanti trains at Lockerbie also serve Carlisle (37.2 km south-east, 51.7% on time, 4.6% cancelled), Penrith (North Lakes) (63.8 km south-east, 46.3% on time, 4.9% cancelled), Shieldmuir (82.2 km north-west, – on time, – cancelled), Motherwell (84.7 km north-west, 57.9% on time, 5.4% cancelled), Haymarket (91.9 km north, 66.1% on time, 4.5% cancelled) and Edinburgh (92.8 km north, 66.3% on time, 4.4% cancelled), which are the stations on its network closest to Lockerbie.
Avanti ranks 2nd of the 3 operators with enough records at Lockerbie, on 53.1%.
For Avanti, Lockerbie is the 28th best of 42 ranked stations. Its 53.1% here is 2.1 percentage points below the 55.2% across the whole network.
Avanti at Lockerbie has edged up: 53.1% of stops came within three minutes of the timetable in the latest 13 periods, 3.6 percentage points better than the 49.5% of the 13 before. Cancellations rose to 5.0% of scheduled stops from 3.3%, which is 1.7 percentage points more.
Over three full railway years Avanti at Lockerbie has improved each time, from 46.8% within three minutes in 2023-24 to 53.0% in 2024-25 and 54.1% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 147 | 60.7% | 1.4% |
| Period 6 of 2026-27 | 147 | 46.5% | 2.0% |
| Period 5 of 2026-27 | 148 | 46.4% | 6.8% |
| Period 4 of 2026-27 | 148 | 34.1% | 6.8% |
| Period 3 of 2026-27 | 158 | 55.5% | 1.9% |
| Period 2 of 2026-27 | 136 | 53.1% | 4.4% |
| Period 1 of 2026-27 | 106 | 49.1% | 0.0% |
| Period 13 of 2025-26 | 248 | 55.7% | 4.8% |
| Period 12 of 2025-26 | 148 | 49.3% | 6.8% |
| Period 11 of 2025-26 | 242 | 72.0% | 2.1% |
| Period 10 of 2025-26 | 210 | 69.7% | 10.5% |
| Period 9 of 2025-26 | 147 | 35.3% | 9.5% |
| Period 8 of 2025-26 | 143 | 39.6% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Lockerbie
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 11,524 | 57.2% | 4.8% |
| Lumo (West Coast) | 813 | 50.3% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out