Llanfairpwll
LPGWalesManaged by TfW Rail
How this station is performing
Llanfairpwll has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,014 scheduled stops, about 36 a day. In those periods 77.5% of stops arrived within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Llanfairpwll opened on 1 August 1848 and closed to passengers on 14 February 1966. It reopened on 7 May 1973, 53 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Llanfairpwll is the oldest; the next oldest, Bangor (Gwynedd), dates from 1848.
The nearest stations to Llanfairpwll are Bangor (Gwynedd) (4.9 km east), Bodorgan (13.9 km west), Llanfairfechan (15.6 km east), Ty Croes (17.6 km west) and Rhosneigr (19.8 km west). 1 stations lie within 10 km in all. At 77.5%, Llanfairpwll is more punctual than every one of them; the best of the five, Llanfairfechan, manages 77.2%.
Across the whole run of data, the weakest four-week period for Llanfairpwll was Period 3 of 2023-24, at 54.8%, some time before the latest year. The strongest was Period 13 of 2023-24, at 90.5%, and the two are 35.7 percentage points apart. Cancellations peaked at 6.3% of scheduled stops in Period 9 of 2024-25, against 2.5% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Llanfairpwll on 77.5%. The comparison group includes Clarbeston Road (76.5%), Buckley (80.7%) and Caergwrle (78.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,014 | 77.5% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Llanfairpwll? Delay Repay
These operators call at Llanfairpwll and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,331 | 79.0% | 2.7% |
| Period 6 of 2026-27 | 1,337 | 73.9% | 3.2% |
| Period 5 of 2026-27 | 1,279 | 79.3% | 2.5% |
| Period 4 of 2026-27 | 1,327 | – | 2.9% |
| Period 3 of 2026-27 | 1,345 | 79.0% | 2.8% |
| Period 2 of 2026-27 | 1,042 | 76.4% | 2.1% |
| Period 1 of 2026-27 | 871 | 78.0% | 1.3% |
| Period 13 of 2025-26 | 824 | 82.2% | 2.1% |
| Period 12 of 2025-26 | 751 | 84.0% | 1.6% |
| Period 11 of 2025-26 | 744 | 82.4% | 1.9% |
| Period 10 of 2025-26 | 677 | 79.1% | 2.8% |
| Period 9 of 2025-26 | 734 | 66.7% | 3.7% |
| Period 8 of 2025-26 | 752 | 68.4% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Clarbeston Road | 12,945 | 76.5% | 3.4% |
| Buckley | 13,328 | 80.7% | 4.1% |
| Caergwrle | 13,328 | 78.5% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out