Great Western Railway at Llanelli
All trains at LlanelliGreat Western Railway across BritainWales
How this operator is doing here
Great Western Railway had 4,644 scheduled stops at Llanelli in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 76.0% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
Great Western Railway trains at Llanelli also serve Pembrey and Burry Port (6.2 km west, 76.6% on time, 6.0% cancelled), Kidwelly (12.7 km north-west, – on time, – cancelled), Swansea (16.1 km east, 64.0% on time, 2.5% cancelled), Ferryside (17.8 km north-west, – on time, – cancelled), Carmarthen (22.3 km north-west, 78.5% on time, 6.0% cancelled) and Neath (24.4 km east, 63.3% on time, 2.3% cancelled), which are the stations on its network closest to Llanelli.
Within 30 km of here, Great Western Railway runs best at Carmarthen, 22.3 km north-west (78.5%), and worst at Port Talbot Parkway, 27.7 km east (62.4%).
The busiest Great Western Railway station within 30 km of Llanelli is Port Talbot Parkway, 27.7 km east, with about 41 scheduled stops a day.
Of the 2 operators with enough records at Llanelli, Great Western Railway is the most punctual, at 76.0%.
Over three full railway years Great Western Railway at Llanelli has improved each time, from 70.3% within three minutes in 2023-24 to 76.6% in 2024-25 and 78.5% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 346 | 77.0% | 8.4% |
| Period 6 of 2026-27 | 377 | 73.9% | 7.4% |
| Period 5 of 2026-27 | 378 | 66.9% | 5.6% |
| Period 4 of 2026-27 | 377 | 72.9% | 4.2% |
| Period 3 of 2026-27 | 372 | 76.8% | 6.2% |
| Period 2 of 2026-27 | 372 | 74.2% | 4.0% |
| Period 1 of 2026-27 | 424 | 82.4% | 5.0% |
| Period 13 of 2025-26 | 402 | 78.6% | 3.5% |
| Period 12 of 2025-26 | 338 | 85.6% | 3.6% |
| Period 11 of 2025-26 | 295 | 81.3% | 2.0% |
| Period 10 of 2025-26 | 336 | 71.3% | 4.5% |
| Period 9 of 2025-26 | 347 | 67.7% | 17.0% |
| Period 8 of 2025-26 | 280 | 78.8% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Llanelli
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,158 | 68.6% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out