Avanti at Llandudno Junction
How this operator is doing here
Avanti had 4,775 scheduled stops at Llandudno Junction in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 75.0% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
Avanti trains at Llandudno Junction also serve Colwyn Bay (5.7 km east, 77.3% on time, 2.8% cancelled), Rhyl (21.6 km east, 72.3% on time, 2.9% cancelled), Bangor (Gwynedd) (22.8 km west, 74.0% on time, 3.5% cancelled), Prestatyn (27.3 km east, 71.8% on time, 2.8% cancelled), Flint (45.1 km east, 67.5% on time, 2.9% cancelled) and Holyhead (54.7 km west, 76.3% on time, 3.6% cancelled), which are the stations on its network closest to Llandudno Junction.
Within 30 km of here, Avanti runs best at Colwyn Bay, 5.7 km east (77.3%), and worst at Prestatyn, 27.3 km east (71.8%).
The busiest Avanti station within 30 km of Llandudno Junction is Colwyn Bay, 5.7 km east, with about 13 scheduled stops a day.
Avanti at Llandudno Junction improved sharply over the past year. In the latest 13 periods 75.0% of stops came within three minutes of the timetable, up 8.8 percentage points from 66.2% in the 13 before. Cancellations fell to 3.1% of scheduled stops from 4.4%, which is 1.3 percentage points fewer.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 368 | 79.7% | 0.8% |
| Period 6 of 2026-27 | 368 | 69.0% | 1.1% |
| Period 5 of 2026-27 | 368 | 71.7% | 6.0% |
| Period 4 of 2026-27 | 368 | 69.3% | 7.1% |
| Period 3 of 2026-27 | 345 | 73.6% | 2.3% |
| Period 2 of 2026-27 | 368 | 71.6% | 3.3% |
| Period 1 of 2026-27 | 420 | 85.9% | 2.4% |
| Period 13 of 2025-26 | 406 | 82.8% | 1.0% |
| Period 12 of 2025-26 | 368 | 80.3% | 2.2% |
| Period 11 of 2025-26 | 368 | 82.2% | 3.8% |
| Period 10 of 2025-26 | 319 | 77.8% | 4.1% |
| Period 9 of 2025-26 | 351 | 59.3% | 4.0% |
| Period 8 of 2025-26 | 358 | 68.3% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Llandudno Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 38,378 | 84.4% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out