Northern at Littleborough
All trains at LittleboroughNorthern across BritainNorth West
How this operator is doing here
Northern had 26,523 scheduled stops at Littleborough in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 70.2% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.
Northern trains at Littleborough also serve Smithy Bridge (1.7 km south-west, 70.8% on time, 3.0% cancelled), Rochdale (5.3 km south-west, 65.5% on time, 3.2% cancelled), Walsden (6.0 km north, 74.8% on time, 2.8% cancelled), Castleton (Manchester) (7.8 km south-west, 75.1% on time, 4.3% cancelled), Todmorden (7.9 km north, 63.4% on time, 2.8% cancelled) and Mills Hill (Manchester) (11.4 km south-west, 70.0% on time, 4.4% cancelled), which are the stations on its network closest to Littleborough.
Within 30 km of here, Northern runs best at Rose Hill Marple, 27.5 km south (93.3%), and worst at Moses Gate, 22.4 km south-west (52.6%).
The busiest Northern station within 30 km of Littleborough is Manchester Piccadilly, 20.5 km south-west, with about 508 scheduled stops a day.
Northern at Littleborough has slipped a little, from 74.8% within three minutes in the previous 13 periods to 70.2% in the latest 13, a fall of 4.6 percentage points. Cancellations fell to 3.0% of scheduled stops from 4.9%, which is 1.9 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,079 | 66.7% | 1.9% |
| Period 6 of 2026-27 | 2,065 | 76.1% | 1.9% |
| Period 5 of 2026-27 | 1,894 | 75.9% | 4.0% |
| Period 4 of 2026-27 | 1,793 | 71.7% | 3.3% |
| Period 3 of 2026-27 | 1,775 | 72.0% | 2.6% |
| Period 2 of 2026-27 | 2,080 | 62.7% | 3.3% |
| Period 1 of 2026-27 | 2,394 | 74.9% | 2.5% |
| Period 13 of 2025-26 | 2,269 | 73.9% | 2.1% |
| Period 12 of 2025-26 | 2,076 | 66.4% | 2.0% |
| Period 11 of 2025-26 | 2,077 | 67.4% | 2.8% |
| Period 10 of 2025-26 | 1,893 | 72.3% | 4.2% |
| Period 9 of 2025-26 | 2,056 | 63.7% | 4.9% |
| Period 8 of 2025-26 | 2,072 | 68.3% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out