Lelant Saltings
LTSSouth WestManaged by Great Western Railway
How this station is performing
Lelant Saltings has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 751 scheduled stops, about 2 a day. In those periods 97.8% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Lelant Saltings opened on 29 May 1978, 48 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Lelant Saltings is the newest; the oldest, St Erth, opened in 1852.
The nearest stations to Lelant Saltings are Lelant (0.7 km north-east), St Erth (0.9 km south), Hayle (1.7 km north-east), Carbis Bay (2.6 km north-west) and St Ives (Cornwall) (4.2 km north-west). 6 stations lie within 10 km in all. At 97.8%, Lelant Saltings is more punctual than every one of them; the best of the five, Carbis Bay, manages 97.3%.
Lelant Saltings takes its name from a settlement called Lelant Saltings, and the station stands 0.0 km from its centre.
Lelant Saltings is among the most punctual stations in Britain. Its 97.8% puts it 20th out of 2,374 ranked stations, with 19 ahead of it and 2,354 behind, and 13.9 percentage points above the national median of 83.9%.
Within South West, Lelant Saltings is the most punctual of 147 ranked stations, at 97.8%. That is 23.8 percentage points above the area median of 74.0%.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 751 | 97.8% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Lelant Saltings? Delay Repay
These operators call at Lelant Saltings and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 60 | 96.6% | 0.0% |
| Period 6 of 2026-27 | 60 | 100.0% | 0.0% |
| Period 5 of 2026-27 | 60 | 98.2% | 1.7% |
| Period 4 of 2026-27 | 60 | 96.1% | 3.3% |
| Period 3 of 2026-27 | 60 | 98.3% | 0.0% |
| Period 2 of 2026-27 | 60 | 100.0% | 0.0% |
| Period 1 of 2026-27 | 68 | 96.8% | 0.0% |
| Period 13 of 2025-26 | 67 | 98.4% | 4.5% |
| Period 12 of 2025-26 | 60 | 94.9% | 0.0% |
| Period 11 of 2025-26 | 30 | – | – |
| Period 10 of 2025-26 | 56 | 98.0% | 8.9% |
| Period 9 of 2025-26 | 50 | – | – |
| Period 8 of 2025-26 | 60 | 98.3% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Coombe Junction Halt | 946 | 90.9% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out