Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

East Midlands Railway at Leicester

All trains at LeicesterEast Midlands Railway across BritainEast Midlands

On time, last 13 periods64.7%Whole station: 65.8%
Cancelled4.0%Whole station: 3.7%
Scheduled stops55,914Of 79,310 at the station

How this operator is doing here

East Midlands Railway had 55,914 scheduled stops at Leicester in the 13 periods to Period 7 of 2026-27, 71% of the station's total. 64.7% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.

East Midlands Railway trains at Leicester also serve Syston (7.4 km north, 82.5% on time, 3.8% cancelled), Sileby (11.1 km north, 82.2% on time, 3.6% cancelled), Barrow-upon-Soar (13.1 km north, 84.8% on time, 3.9% cancelled), Loughborough (17.1 km north, 65.2% on time, 4.7% cancelled), Melton Mowbray (21.5 km north-east, 81.4% on time, 12.2% cancelled) and Market Harborough (22.3 km south-east, 59.5% on time, 4.9% cancelled), which are the stations on its network closest to Leicester.

Within 30 km of here, East Midlands Railway runs best at Barrow-upon-Soar, 13.1 km north (84.8%), and worst at Market Harborough, 22.3 km south-east (59.5%).

The busiest East Midlands Railway station within 30 km of Leicester is East Midlands Parkway, 27.2 km north, with about 108 scheduled stops a day.

East Midlands Railway at Leicester has slipped a little, from 69.0% within three minutes in the previous 13 periods to 64.7% in the latest 13, a fall of 4.3 percentage points. Cancellations rose to 4.0% of scheduled stops from 2.5%, which is 1.5 percentage points more.

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 71.0%Period 2 of 2023-24: 72.6%Period 3 of 2023-24: 61.8%Period 4 of 2023-24: 70.5%Period 5 of 2023-24: 68.6%Period 6 of 2023-24: 68.6%Period 7 of 2023-24: 65.9%Period 8 of 2023-24: 53.5%Period 9 of 2023-24: 54.3%Period 10 of 2023-24: 57.0%Period 11 of 2023-24: 63.4%Period 12 of 2023-24: 65.6%Period 13 of 2023-24: 70.3%Period 1 of 2024-25: 68.5%Period 2 of 2024-25: 69.5%Period 3 of 2024-25: 66.1%Period 4 of 2024-25: 67.1%Period 5 of 2024-25: 66.3%Period 6 of 2024-25: 66.8%Period 7 of 2024-25: 63.1%Period 8 of 2024-25: 64.0%Period 9 of 2024-25: 58.7%Period 10 of 2024-25: 67.2%Period 11 of 2024-25: 68.2%Period 12 of 2024-25: 72.5%Period 13 of 2024-25: 74.6%Period 1 of 2025-26: 74.5%Period 2 of 2025-26: 73.7%Period 3 of 2025-26: 70.1%Period 4 of 2025-26: 70.1%Period 5 of 2025-26: 68.4%Period 6 of 2025-26: 68.4%Period 7 of 2025-26: 66.2%Period 8 of 2025-26: 65.9%Period 9 of 2025-26: 58.4%Period 10 of 2025-26: 69.6%Period 11 of 2025-26: 71.2%Period 12 of 2025-26: 67.2%Period 13 of 2025-26: 63.5%Period 1 of 2026-27: 64.3%Period 2 of 2026-27: 62.8%Period 3 of 2026-27: 59.8%Period 4 of 2026-27: 58.5%Period 5 of 2026-27: 64.7%Period 6 of 2026-27: 66.8%Period 7 of 2026-27: 67.3%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 0.6%Period 2 of 2023-24: 0.5%Period 3 of 2023-24: 1.3%Period 4 of 2023-24: 1.3%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 0.4%Period 7 of 2023-24: 1.4%Period 8 of 2023-24: 4.0%Period 9 of 2023-24: 2.3%Period 10 of 2023-24: 3.8%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 1.0%Period 13 of 2023-24: 0.5%Period 1 of 2024-25: 1.4%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 0.8%Period 4 of 2024-25: 2.8%Period 5 of 2024-25: 0.9%Period 6 of 2024-25: 2.3%Period 7 of 2024-25: 1.5%Period 8 of 2024-25: 3.4%Period 9 of 2024-25: 4.9%Period 10 of 2024-25: 2.1%Period 11 of 2024-25: 3.3%Period 12 of 2024-25: 1.0%Period 13 of 2024-25: 2.1%Period 1 of 2025-26: 0.7%Period 2 of 2025-26: 0.8%Period 3 of 2025-26: 2.9%Period 4 of 2025-26: 2.1%Period 5 of 2025-26: 5.0%Period 6 of 2025-26: 1.6%Period 7 of 2025-26: 2.5%Period 8 of 2025-26: 1.0%Period 9 of 2025-26: 2.2%Period 10 of 2025-26: 1.6%Period 11 of 2025-26: 2.7%Period 12 of 2025-26: 2.9%Period 13 of 2025-26: 4.6%Period 1 of 2026-27: 4.5%Period 2 of 2026-27: 5.1%Period 3 of 2026-27: 6.9%Period 4 of 2026-27: 9.1%Period 5 of 2026-27: 5.2%Period 6 of 2026-27: 3.5%Period 7 of 2026-27: 2.9%2023-242024-252025-262026-27

See how East Midlands Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-274,21067.3%2.9%
Period 6 of 2026-273,91166.8%3.5%
Period 5 of 2026-273,79764.7%5.2%
Period 4 of 2026-274,08358.5%9.1%
Period 3 of 2026-273,74759.8%6.9%
Period 2 of 2026-274,39662.8%5.1%
Period 1 of 2026-275,07064.3%4.5%
Period 13 of 2025-264,88563.5%4.6%
Period 12 of 2025-264,47967.2%2.9%
Period 11 of 2025-264,44671.2%2.7%
Period 10 of 2025-264,08669.6%1.6%
Period 9 of 2025-264,35158.4%2.2%
Period 8 of 2025-264,45365.9%1.0%

Time of year

60%70%80%90%P1: 69.4%1P2: 69.7%2P3: 64.7%3P4: 66.7%4P5: 67.1%5P6: 67.7%6P7: 65.6%7P8: 61.4%8P9: 57.2%9P10: 64.6%10P11: 67.7%11P12: 68.4%12P13: 69.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Leicester

OperatorScheduled stopsWithin 3 minCancelled
CrossCountry23,39668.5%3.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out