Knighton
KNIWest MidlandsManaged by TfW Rail
How this station is performing
Knighton had 3,625 scheduled stops to Period 7 of 2026-27, about 10 a day. 81.3% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Knighton opened on 6 March 1861, 165 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Knighton is the oldest; the next oldest, Bucknell, dates from 1861.
The nearest stations to Knighton are Knucklas (4.1 km north-west), Bucknell (6.6 km east), Llangynllo (8.1 km west), Hopton Heath (10.2 km north-east) and Llanbister Road (11.7 km west). 3 stations lie within 10 km in all.
Knighton is one of 15 stations named after a market town called Knighton, home to about 3,719 people; this one stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Knighton was Period 9 of 2023-24, at 43.8%, some time before the latest year. The strongest was Period 6 of 2025-26, at 92.3%, and the two are 48.5 percentage points apart. Cancellations peaked at 12.2% of scheduled stops in Period 8 of 2024-25, against 3.1% over the latest 13 periods.
2 of 3 stations of a similar size in West Midlands are more punctual than Knighton on 81.3%. The comparison group includes Water Orton (66.2%), Bearley (90.0%) and Claverdon (89.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 3,625 | 81.3% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Knighton? Delay Repay
These operators call at Knighton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 236 | 78.8% | 4.2% |
| Period 6 of 2026-27 | 300 | 75.3% | 1.7% |
| Period 5 of 2026-27 | 283 | 71.2% | 3.2% |
| Period 4 of 2026-27 | 293 | 76.0% | 6.1% |
| Period 3 of 2026-27 | 296 | 81.6% | 2.7% |
| Period 2 of 2026-27 | 282 | 79.4% | 5.3% |
| Period 1 of 2026-27 | 342 | 83.9% | 2.0% |
| Period 13 of 2025-26 | 324 | 87.5% | 1.2% |
| Period 12 of 2025-26 | 292 | 84.0% | 1.7% |
| Period 11 of 2025-26 | 257 | 85.5% | 6.2% |
| Period 10 of 2025-26 | 252 | 80.6% | 2.0% |
| Period 9 of 2025-26 | 222 | 83.8% | 2.7% |
| Period 8 of 2025-26 | 246 | 89.6% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Water Orton | 5,147 | 66.2% | 4.3% |
| Bearley | 6,334 | 90.0% | 2.3% |
| Claverdon | 6,357 | 89.7% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out