Northern at Kirkham and Wesham
All trains at Kirkham and WeshamNorthern across BritainNorth West
How this operator is doing here
Northern had 46,886 scheduled stops at Kirkham and Wesham in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 77.4% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.
Northern trains at Kirkham and Wesham also serve Salwick (4.3 km east, 83.0% on time, 1.8% cancelled), Moss Side (4.6 km south-west, 78.7% on time, 3.0% cancelled), Lytham (7.5 km south-west, 76.9% on time, 3.2% cancelled), Ansdell and Fairhaven (8.8 km south-west, 76.1% on time, 3.3% cancelled), Poulton-le-Fylde (9.8 km north-west, 80.7% on time, 4.7% cancelled) and St Annes-on-the-Sea (10.3 km west, 74.3% on time, 3.7% cancelled), which are the stations on its network closest to Kirkham and Wesham.
Within 30 km of here, Northern runs best at Rufford, 17.7 km south (89.5%), and worst at Adlington (Lancashire), 26.7 km south-east (56.3%).
The busiest Northern station within 30 km of Kirkham and Wesham is Preston (Lancs), 12.1 km east, with about 260 scheduled stops a day.
Of the 1 operators with enough records at Kirkham and Wesham, Northern is the most punctual, at 77.4%.
Over three full railway years Northern at Kirkham and Wesham has got worse each time, from 83.1% within three minutes in 2023-24 to 81.6% in 2024-25 and 78.2% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,574 | 76.5% | 3.7% |
| Period 6 of 2026-27 | 3,564 | 80.9% | 3.8% |
| Period 5 of 2026-27 | 3,584 | 74.3% | 5.5% |
| Period 4 of 2026-27 | 3,580 | 74.4% | 4.2% |
| Period 3 of 2026-27 | 3,572 | 76.0% | 5.2% |
| Period 2 of 2026-27 | 3,583 | 78.5% | 3.5% |
| Period 1 of 2026-27 | 4,133 | 81.2% | 3.4% |
| Period 13 of 2025-26 | 3,910 | 80.2% | 7.1% |
| Period 12 of 2025-26 | 3,532 | 81.2% | 3.1% |
| Period 11 of 2025-26 | 3,466 | 83.6% | 4.0% |
| Period 10 of 2025-26 | 2,980 | 76.3% | 7.6% |
| Period 9 of 2025-26 | 3,734 | 68.4% | 4.6% |
| Period 8 of 2025-26 | 3,674 | 74.3% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kirkham and Wesham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 44 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out