Kings Norton
KNNWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Kings Norton had 59,757 scheduled stops to Period 7 of 2026-27, about 164 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Kings Norton opened on 1 May 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kings Norton is the oldest; the next oldest, Northfield, dates from 1870.
The nearest stations to Kings Norton are Bournville (1.5 km north), Northfield (2.3 km west), Selly Oak (3.1 km north), Longbridge (3.8 km south-west) and University (Birmingham) (4.2 km north). 31 stations lie within 10 km in all. Of the five, Northfield is the most punctual at 83.9% and University (Birmingham) the least at 76.4%, with Kings Norton on 77.2%.
Kings Norton is one of 2 stations named after a suburb called Kings Norton, home to about 24,380 people; this one stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for Kings Norton was Period 9 of 2024-25, at 62.4%, some time before the latest year. The strongest was Period 1 of 2025-26, at 86.9%, and the two are 24.5 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 10 of 2024-25, against 3.0% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Kings Norton is the most punctual, at 77.2%. The comparison group includes Leamington Spa (76.2%), Nuneaton (63.7%) and Rugby (62.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 59,757 | 77.2% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Kings Norton? Delay Repay
These operators call at Kings Norton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,416 | 72.6% | 4.0% |
| Period 6 of 2026-27 | 5,416 | 76.7% | 3.1% |
| Period 5 of 2026-27 | 5,386 | 76.8% | 2.5% |
| Period 4 of 2026-27 | 5,019 | 72.2% | 6.2% |
| Period 3 of 2026-27 | 4,968 | 78.9% | 2.3% |
| Period 2 of 2026-27 | 5,084 | 78.3% | 2.7% |
| Period 1 of 2026-27 | 5,895 | 80.7% | 1.7% |
| Period 13 of 2025-26 | 4,175 | 81.5% | 1.5% |
| Period 12 of 2025-26 | 3,800 | 84.8% | 1.4% |
| Period 11 of 2025-26 | 3,613 | 84.6% | 3.8% |
| Period 10 of 2025-26 | 3,457 | 81.0% | 1.7% |
| Period 9 of 2025-26 | 3,728 | 67.2% | 5.0% |
| Period 8 of 2025-26 | 3,800 | 68.8% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Leamington Spa | 60,533 | 76.2% | 3.3% |
| Nuneaton | 60,896 | 63.7% | 5.2% |
| Rugby | 65,000 | 62.9% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out