East Midlands Railway at Kidsgrove
All trains at KidsgroveEast Midlands Railway across BritainWest Midlands
How this operator is doing here
East Midlands Railway had 10,792 scheduled stops at Kidsgrove in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 70.9% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
East Midlands Railway trains at Kidsgrove also serve Alsager (3.7 km west, 78.5% on time, 3.3% cancelled), Longport (5.3 km south, 67.2% on time, 2.8% cancelled), Stoke-on-Trent (9.7 km south-east, 71.2% on time, 2.8% cancelled), Crewe (12.5 km west, 76.5% on time, 3.3% cancelled), Longton (12.9 km south-east, 68.6% on time, 2.5% cancelled) and Blythe Bridge (17.7 km south-east, 75.5% on time, 2.4% cancelled), which are the stations on its network closest to Kidsgrove.
Within 30 km of here, East Midlands Railway runs best at Alsager, 3.7 km west (78.5%), and worst at Longton, 12.9 km south-east (68.6%).
The busiest East Midlands Railway station within 30 km of Kidsgrove is Stoke-on-Trent, 9.7 km south-east, with about 30 scheduled stops a day.
East Midlands Railway ranks 2nd of the 3 operators with enough records at Kidsgrove, on 70.9%.
East Midlands Railway at Kidsgrove has slipped a little, from 73.9% within three minutes in the previous 13 periods to 70.9% in the latest 13, a fall of 3.0 percentage points. Cancellations fell to 3.3% of scheduled stops from 4.4%, which is 1.1 percentage points fewer.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 828 | 68.9% | 2.7% |
| Period 6 of 2026-27 | 828 | 65.6% | 1.8% |
| Period 5 of 2026-27 | 827 | 66.4% | 5.0% |
| Period 4 of 2026-27 | 761 | 61.0% | 3.4% |
| Period 3 of 2026-27 | 827 | 67.0% | 5.1% |
| Period 2 of 2026-27 | 828 | 76.9% | 4.8% |
| Period 1 of 2026-27 | 956 | 79.9% | 3.0% |
| Period 13 of 2025-26 | 907 | 78.1% | 3.0% |
| Period 12 of 2025-26 | 828 | 73.8% | 0.8% |
| Period 11 of 2025-26 | 786 | 78.6% | 4.3% |
| Period 10 of 2025-26 | 760 | 71.9% | 1.6% |
| Period 9 of 2025-26 | 828 | 59.7% | 5.1% |
| Period 8 of 2025-26 | 828 | 71.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kidsgrove
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,126 | 70.4% | 4.1% |
| Northern | 11,474 | 75.8% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out