Keynsham
KYNSouth WestManaged by Great Western Railway
How this station is performing
Keynsham had 23,278 scheduled stops to Period 7 of 2026-27, about 64 a day. 74.7% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Keynsham opened on 31 August 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Keynsham is the oldest; the next oldest, Bristol Temple Meads, dates from 1840.
The nearest stations to Keynsham are Lawrence Hill (6.5 km north-west), Bristol Temple Meads (6.8 km north-west), Bedminster (7.2 km west), Stapleton Road (7.3 km north-west) and Parson Street (8.0 km west). 10 stations lie within 10 km in all. Of the five, Lawrence Hill is the most punctual at 82.8% and Bristol Temple Meads the least at 70.8%, with Keynsham on 74.7%.
Keynsham takes its name from a market town called Keynsham, home to about 19,596 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Keynsham was Period 9 of 2023-24, at 61.0%, some time before the latest year. The strongest was Period 12 of 2025-26, at 86.2%, and the two are 25.2 percentage points apart. Cancellations peaked at 11.9% of scheduled stops in Period 9 of 2024-25, against 4.5% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Keynsham is the most punctual, at 74.7%. The comparison group includes Warminster (72.2%), Pokesdown (70.6%) and Penzance (69.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 23,278 | 74.7% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Keynsham? Delay Repay
These operators call at Keynsham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,797 | 71.5% | 4.2% |
| Period 6 of 2026-27 | 1,795 | 73.1% | 3.3% |
| Period 5 of 2026-27 | 1,765 | 69.0% | 5.0% |
| Period 4 of 2026-27 | 1,832 | 61.9% | 5.9% |
| Period 3 of 2026-27 | 1,707 | 75.4% | 9.2% |
| Period 2 of 2026-27 | 1,793 | 73.0% | 7.0% |
| Period 1 of 2026-27 | 2,065 | 82.0% | 1.7% |
| Period 13 of 2025-26 | 1,967 | 82.3% | 3.9% |
| Period 12 of 2025-26 | 1,794 | 86.2% | 1.5% |
| Period 11 of 2025-26 | 1,795 | 82.8% | 3.2% |
| Period 10 of 2025-26 | 1,638 | 72.2% | 4.6% |
| Period 9 of 2025-26 | 1,809 | 66.8% | 6.1% |
| Period 8 of 2025-26 | 1,521 | 72.3% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warminster | 23,220 | 72.2% | 5.5% |
| Pokesdown | 23,697 | 70.6% | 5.9% |
| Penzance | 22,795 | 69.4% | 5.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out