Johnston (Pembs)
JOHWalesManaged by TfW Rail
How this station is performing
Johnston (Pembs) has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 8,256 scheduled stops, about 23 a day. In those periods 80.3% of stops arrived within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Johnston (Pembs) opened on 15 April 1856, 170 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Haverfordwest is the oldest (1854) and Pembroke Dock the newest (1864), with Johnston (Pembs) in between.
The nearest stations to Johnston (Pembs) are Milford Haven (5.4 km south-west), Haverfordwest (5.7 km north-east), Pembroke Dock (8.0 km south-east), Pembroke (11.1 km south-east) and Lamphey (13.1 km south-east). 3 stations lie within 10 km in all. Of the five, Milford Haven is the most punctual at 80.9% and Pembroke the least at 74.4%, with Johnston (Pembs) on 80.3%.
Johnston (Pembs) is named after Johnston, a Village, home to about 2,218 people, but the station stands 0.3 km from its centre.
1 of 3 stations of a similar size in Wales are more punctual than Johnston (Pembs) on 80.3%. The comparison group includes Milford Haven (80.9%), Haverfordwest (77.5%) and Caersws (64.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 8,256 | 80.3% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Johnston (Pembs)? Delay Repay
These operators call at Johnston (Pembs) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 638 | – | 4.9% |
| Period 6 of 2026-27 | 670 | 78.8% | 2.4% |
| Period 5 of 2026-27 | 662 | 76.1% | 6.0% |
| Period 4 of 2026-27 | 652 | – | 6.0% |
| Period 3 of 2026-27 | 646 | 83.7% | 5.9% |
| Period 2 of 2026-27 | 638 | 81.9% | 13.2% |
| Period 1 of 2026-27 | 738 | 81.7% | 4.5% |
| Period 13 of 2025-26 | 676 | 84.7% | 4.1% |
| Period 12 of 2025-26 | 640 | 84.5% | 2.8% |
| Period 11 of 2025-26 | 611 | 87.9% | 5.7% |
| Period 10 of 2025-26 | 551 | 81.1% | 3.4% |
| Period 9 of 2025-26 | 610 | 64.8% | 6.7% |
| Period 8 of 2025-26 | 524 | 77.9% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Milford Haven | 8,258 | 80.9% | 5.4% |
| Haverfordwest | 8,385 | 77.5% | 4.1% |
| Caersws | 8,579 | 64.3% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out