Great Western Railway at Ivybridge
All trains at IvybridgeGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 10,183 scheduled stops at Ivybridge in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 67.8% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
Great Western Railway trains at Ivybridge also serve Totnes (16.0 km east, 61.5% on time, 3.9% cancelled), Plymouth (17.0 km west, 69.4% on time, 4.0% cancelled), Devonport (18.9 km west, 82.2% on time, 4.1% cancelled), Dockyard (Devonport) (19.3 km west, 81.5% on time, 3.6% cancelled), Keyham (19.5 km west, 81.9% on time, 4.0% cancelled) and St Budeaux Ferry Road (20.0 km west, 76.5% on time, 6.8% cancelled), which are the stations on its network closest to Ivybridge.
Within 30 km of here, Great Western Railway runs best at Paignton, 24.6 km east (87.3%), and worst at Totnes, 16.0 km east (61.5%).
The busiest Great Western Railway station within 30 km of Ivybridge is Newton Abbot, 26.4 km north-east, with about 127 scheduled stops a day.
Great Western Railway at Ivybridge has slipped a little, from 72.7% within three minutes in the previous 13 periods to 67.8% in the latest 13, a fall of 4.9 percentage points. Cancellations rose to 4.7% of scheduled stops from 3.3%, which is 1.4 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 787 | 77.2% | 2.0% |
| Period 6 of 2026-27 | 801 | 69.9% | 6.5% |
| Period 5 of 2026-27 | 810 | 63.0% | 11.0% |
| Period 4 of 2026-27 | 812 | 61.4% | 7.8% |
| Period 3 of 2026-27 | 809 | 63.1% | 6.2% |
| Period 2 of 2026-27 | 810 | 69.8% | 4.2% |
| Period 1 of 2026-27 | 930 | 72.0% | 0.8% |
| Period 13 of 2025-26 | 672 | 76.7% | 3.4% |
| Period 12 of 2025-26 | 583 | 79.5% | 0.5% |
| Period 11 of 2025-26 | 811 | 72.2% | 8.0% |
| Period 10 of 2025-26 | 718 | 63.9% | 2.6% |
| Period 9 of 2025-26 | 820 | 54.6% | 5.0% |
| Period 8 of 2025-26 | 820 | 60.9% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out