Ince and Elton (Cheshire)
INENorth WestManaged by Northern Trains
How this station is performing
Ince and Elton (Cheshire) has usable figures for 7 of the last 13 four-week periods to Period 7 of 2026-27, covering 1,260 scheduled stops, about 4 a day. In those periods 93.6% of stops arrived within three minutes of the timetable and 11.0% of scheduled stops were cancelled.
Ince and Elton (Cheshire) opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Frodsham is the oldest (1850) and Overpool the newest (1988), with Ince and Elton (Cheshire) in between.
The nearest stations to Ince and Elton (Cheshire) are Stanlow and Thornton (1.7 km west), Helsby (3.0 km east), Ellesmere Port (5.3 km west), Frodsham (6.5 km east) and Overpool (7.3 km west). 13 stations lie within 10 km in all. Of the five, Overpool is the most punctual at 97.9% and Helsby the least at 77.2%, with Ince and Elton (Cheshire) on 93.6%.
Ince and Elton (Cheshire) is named after Ince, a Village, home to about 214 people, but the station stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for Ince and Elton (Cheshire) was Period 1 of 2023-24, at 75.0%, some time before the latest year. The strongest was Period 2 of 2025-26, at 100.0%, and the two are 25.0 percentage points apart. Cancellations peaked at 50.0% of scheduled stops in Period 5 of 2024-25, against 11.0% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 1,260 | 93.6% | 11.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 96 | – | 6.3% |
| Period 6 of 2026-27 | 96 | 83.3% | 8.3% |
| Period 5 of 2026-27 | 96 | 97.1% | 4.2% |
| Period 4 of 2026-27 | 96 | 96.3% | 4.2% |
| Period 3 of 2026-27 | 92 | 87.7% | 4.3% |
| Period 2 of 2026-27 | 96 | – | 0.0% |
| Period 1 of 2026-27 | 112 | – | 5.4% |
| Period 13 of 2025-26 | 104 | 96.8% | 0.0% |
| Period 12 of 2025-26 | 96 | – | 4.2% |
| Period 11 of 2025-26 | 96 | 97.8% | 8.3% |
| Period 10 of 2025-26 | 88 | – | 45.5% |
| Period 9 of 2025-26 | 96 | – | 31.3% |
| Period 8 of 2025-26 | 96 | 96.1% | 25.0% |