Northern at Ilkeston
How this operator is doing here
Northern had 12,472 scheduled stops at Ilkeston in the 13 periods to Period 7 of 2026-27, 78% of the station's total. 73.2% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Northern trains at Ilkeston also serve Langley Mill (4.9 km north-west, 75.3% on time, 2.2% cancelled), Nottingham (10.7 km east, 76.6% on time, 2.1% cancelled), Alfreton (14.4 km north, 78.1% on time, 2.1% cancelled), Chesterfield (30.0 km north, 79.1% on time, 1.9% cancelled), Dronfield (37.6 km north, 77.1% on time, 1.7% cancelled) and Worksop (38.7 km north, 81.4% on time, 2.0% cancelled), which are the stations on its network closest to Ilkeston.
Within 30 km of here, Northern runs best at Chesterfield, 30.0 km north (79.1%), and worst at Langley Mill, 4.9 km north-west (75.3%).
The busiest Northern station within 30 km of Ilkeston is Chesterfield, 30.0 km north, with about 35 scheduled stops a day.
Of the 2 operators with enough records at Ilkeston, Northern is the most punctual, at 73.2%.
For Northern, Ilkeston is the 396th best of 493 ranked stations. Its 73.2% here is 5.4 percentage points below the 78.6% across the whole network.
Northern at Ilkeston has slipped a little, from 75.5% within three minutes in the previous 13 periods to 73.2% in the latest 13, a fall of 2.3 percentage points. Cancellations fell to 2.2% of scheduled stops from 3.6%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 968 | 77.6% | 1.4% |
| Period 6 of 2026-27 | 935 | 73.2% | 1.4% |
| Period 5 of 2026-27 | 810 | 72.7% | 1.4% |
| Period 4 of 2026-27 | 966 | 74.2% | 4.0% |
| Period 3 of 2026-27 | 969 | 70.1% | 2.9% |
| Period 2 of 2026-27 | 972 | 71.3% | 2.7% |
| Period 1 of 2026-27 | 1,108 | 77.2% | 1.2% |
| Period 13 of 2025-26 | 1,000 | 73.2% | 2.5% |
| Period 12 of 2025-26 | 964 | 75.9% | 1.2% |
| Period 11 of 2025-26 | 962 | 76.6% | 1.7% |
| Period 10 of 2025-26 | 882 | 72.2% | 1.6% |
| Period 9 of 2025-26 | 964 | 61.8% | 3.8% |
| Period 8 of 2025-26 | 972 | 74.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ilkeston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 3,560 | 66.6% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out