Avanti at Holyhead
How this operator is doing here
Avanti had 4,776 scheduled stops at Holyhead in the 13 periods to Period 7 of 2026-27, 24% of the station's total. 76.3% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
Avanti trains at Holyhead also serve Bangor (Gwynedd) (34.3 km east, 74.0% on time, 3.5% cancelled), Llandudno Junction (54.7 km east, 75.0% on time, 3.1% cancelled), Colwyn Bay (60.2 km east, 77.3% on time, 2.8% cancelled), Rhyl (75.9 km east, 72.3% on time, 2.9% cancelled), Prestatyn (81.4 km east, 71.8% on time, 2.8% cancelled) and Flint (99.8 km east, 67.5% on time, 2.9% cancelled), which are the stations on its network closest to Holyhead.
Of the 2 operators with enough records at Holyhead, Avanti is the least punctual, at 76.3%.
For Avanti, Holyhead is the 2nd best of 42 ranked stations. Its 76.3% here is 21.1 percentage points above the 55.2% across the whole network.
Avanti at Holyhead improved sharply over the past year. In the latest 13 periods 76.3% of stops came within three minutes of the timetable, up 8.2 percentage points from 68.1% in the 13 before. Cancellations fell to 3.6% of scheduled stops from 4.9%, which is 1.3 percentage points fewer.
Avanti at Holyhead has not moved in one direction over three full railway years: 76.2% within three minutes in 2023-24, 66.3% in 2024-25 and 74.0% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 368 | 77.7% | 1.4% |
| Period 6 of 2026-27 | 368 | 70.4% | 1.9% |
| Period 5 of 2026-27 | 368 | 70.7% | 6.3% |
| Period 4 of 2026-27 | 368 | 73.2% | 7.6% |
| Period 3 of 2026-27 | 346 | 73.6% | 2.6% |
| Period 2 of 2026-27 | 368 | 72.6% | 3.8% |
| Period 1 of 2026-27 | 420 | 85.4% | 2.4% |
| Period 13 of 2025-26 | 406 | 85.3% | 1.5% |
| Period 12 of 2025-26 | 368 | 80.8% | 2.4% |
| Period 11 of 2025-26 | 368 | 84.4% | 4.1% |
| Period 10 of 2025-26 | 319 | 80.6% | 4.7% |
| Period 9 of 2025-26 | 351 | 65.1% | 4.6% |
| Period 8 of 2025-26 | 358 | 68.4% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Holyhead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 15,266 | 79.8% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out