Transport for Wales had 25,367 scheduled stops at Helsby in the 13 periods to Period 7 of 2026-27, 88% of the station's total. 77.4% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Transport for Wales trains at Helsby also serve Frodsham (3.9 km north-east, 79.2% on time, 1.7% cancelled), Runcorn (7.4 km north, 86.2% on time, 2.6% cancelled), Runcorn East (9.1 km north-east, 75.5% on time, 0.9% cancelled), Chester (11.3 km south-west, 82.8% on time, 1.9% cancelled), Liverpool South Parkway (12.1 km north-west, 81.4% on time, 2.9% cancelled) and Warrington Bank Quay (16.6 km north-east, 74.4% on time, 1.2% cancelled), which are the stations on its network closest to Helsby.
Within 30 km of here, Transport for Wales runs best at Wrexham Central, 29.7 km south-west (90.0%), and worst at Nantwich, 28.9 km south-east (69.3%).
The busiest Transport for Wales station within 30 km of Helsby is Chester, 11.3 km south-west, with about 163 scheduled stops a day.
Transport for Wales at Helsby has slipped a little, from 81.0% within three minutes in the previous 13 periods to 77.4% in the latest 13, a fall of 3.6 percentage points. Cancellations held steady at 1.7% of scheduled stops, against 1.7% before.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,962 | 76.4% | 1.0% |
| Period 6 of 2026-27 | 1,987 | 67.9% | 2.4% |
| Period 5 of 2026-27 | 1,963 | 70.2% | 2.4% |
| Period 4 of 2026-27 | 1,974 | 74.6% | 3.3% |
| Period 3 of 2026-27 | 1,951 | 73.7% | 2.3% |
| Period 2 of 2026-27 | 1,899 | 75.2% | 2.2% |
| Period 1 of 2026-27 | 2,130 | 82.9% | 0.6% |
| Period 13 of 2025-26 | 2,087 | 86.5% | 0.6% |
| Period 12 of 2025-26 | 1,916 | 83.7% | 0.8% |
| Period 11 of 2025-26 | 1,878 | 82.6% | 1.9% |
| Period 10 of 2025-26 | 1,797 | 80.7% | 2.0% |
| Period 9 of 2025-26 | 1,892 | 72.4% | 1.6% |
| Period 8 of 2025-26 | 1,931 | 78.7% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Helsby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 3,376 | 75.1% | 7.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out