Hawarden Bridge
HWBWalesManaged by TfW Rail
How this station is performing
Hawarden Bridge had 13,328 scheduled stops to Period 7 of 2026-27, about 37 a day. 73.6% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Hawarden Bridge opened on 22 September 1924, 102 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hawarden Bridge is the newest; the oldest, Flint, opened in 1848.
The nearest stations to Hawarden Bridge are Shotton (0.6 km south-west), Hawarden (3.7 km south), Buckley (6.4 km south), Flint (7.6 km north-west) and Capenhurst (7.6 km north-east). 10 stations lie within 10 km in all. At 73.6%, Hawarden Bridge is less punctual than all of them; the best of the five, Capenhurst, manages 87.2%.
Hawarden Bridge is named after Hawarden, a Village, home to about 13,920 people, but the station stands 4.1 km from its centre.
Across the whole run of data, the weakest four-week period for Hawarden Bridge was Period 9 of 2023-24, at 50.3%, some time before the latest year. The strongest was Period 1 of 2024-25, at 86.3%, and the two are 36.0 percentage points apart. Cancellations peaked at 25.6% of scheduled stops in Period 1 of 2023-24, against 4.1% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Hawarden Bridge is the least punctual, at 73.6%. All of them are ahead, including Buckley (80.7%), Caergwrle (78.5%) and Cefn-y-bedd (77.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,328 | 73.6% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Hawarden Bridge? Delay Repay
These operators call at Hawarden Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,068 | 71.2% | 3.7% |
| Period 6 of 2026-27 | 778 | 71.0% | 5.1% |
| Period 5 of 2026-27 | 801 | 73.6% | 6.5% |
| Period 4 of 2026-27 | 1,068 | 78.8% | 5.0% |
| Period 3 of 2026-27 | 1,068 | 78.4% | 6.7% |
| Period 2 of 2026-27 | 1,068 | 77.2% | 2.8% |
| Period 1 of 2026-27 | 1,232 | 77.5% | 2.6% |
| Period 13 of 2025-26 | 1,171 | 79.7% | 1.6% |
| Period 12 of 2025-26 | 1,068 | 81.3% | 2.8% |
| Period 11 of 2025-26 | 1,000 | 71.8% | 4.2% |
| Period 10 of 2025-26 | 972 | 66.8% | 7.1% |
| Period 9 of 2025-26 | 1,012 | 59.5% | 4.4% |
| Period 8 of 2025-26 | 1,022 | 66.6% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Buckley | 13,328 | 80.7% | 4.1% |
| Caergwrle | 13,328 | 78.5% | 4.1% |
| Cefn-y-bedd | 13,328 | 77.9% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out