Northern at Handforth
How this operator is doing here
Northern had 21,291 scheduled stops at Handforth in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 85.3% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Northern trains at Handforth also serve Styal (1.8 km west, 77.1% on time, 2.3% cancelled), Wilmslow (2.3 km south, 79.8% on time, 2.3% cancelled), Heald Green (3.0 km north-west, 67.6% on time, 6.7% cancelled), Cheadle Hulme (3.7 km north-east, 81.7% on time, 2.6% cancelled), Bramhall (3.7 km north-east, 81.8% on time, 2.1% cancelled) and Manchester Airport (4.4 km north-west, 68.7% on time, 5.5% cancelled), which are the stations on its network closest to Handforth.
Within 30 km of here, Northern runs best at Rose Hill Marple, 10.6 km north-east (93.3%), and worst at Moses Gate, 26.4 km north-west (52.6%).
The busiest Northern station within 30 km of Handforth is Manchester Piccadilly, 14.6 km north, with about 508 scheduled stops a day.
Of the 1 operators with enough records at Handforth, Northern is the most punctual, at 85.3%.
For Northern, Handforth is the 113th best of 493 ranked stations. Its 85.3% here is 6.7 percentage points above the 78.6% across the whole network.
Cancellations of Northern at Handforth are near its usual level: 2.8% of scheduled stops, against 2.8% across its network and 2.8% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,652 | 84.3% | 2.8% |
| Period 6 of 2026-27 | 1,660 | 86.2% | 2.4% |
| Period 5 of 2026-27 | 1,636 | 84.4% | 1.2% |
| Period 4 of 2026-27 | 1,624 | 84.0% | 3.6% |
| Period 3 of 2026-27 | 1,479 | 87.3% | 1.2% |
| Period 2 of 2026-27 | 1,664 | 86.1% | 2.7% |
| Period 1 of 2026-27 | 1,850 | 88.1% | 5.8% |
| Period 13 of 2025-26 | 1,811 | 88.6% | 1.5% |
| Period 12 of 2025-26 | 1,434 | 88.4% | 1.5% |
| Period 11 of 2025-26 | 1,664 | 87.0% | 5.0% |
| Period 10 of 2025-26 | 1,516 | 86.4% | 3.3% |
| Period 9 of 2025-26 | 1,637 | 76.8% | 3.5% |
| Period 8 of 2025-26 | 1,664 | 81.3% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out