Greater Anglia at Hackney Downs
All trains at Hackney DownsGreater Anglia across BritainLondon
How this operator is doing here
Greater Anglia had 24,846 scheduled stops at Hackney Downs in the 13 periods to Period 7 of 2026-27, 19% of the station's total. 89.2% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.
Greater Anglia trains at Hackney Downs also serve Lea Bridge (2.6 km north-east, 97.5% on time, 3.9% cancelled), Bethnal Green (2.8 km south, – on time, – cancelled), London Liverpool Street (3.7 km south-west, 89.7% on time, 1.8% cancelled), Seven Sisters (3.9 km north, 86.0% on time, 1.4% cancelled), Stratford (London) (4.0 km east, 91.2% on time, 2.3% cancelled) and Tottenham Hale (4.4 km north, 90.3% on time, 3.2% cancelled), which are the stations on its network closest to Hackney Downs.
Within 30 km of here, Greater Anglia runs best at Lea Bridge, 2.6 km north-east (97.5%), and worst at Cheshunt, 17.3 km north (85.4%).
The busiest Greater Anglia station within 30 km of Hackney Downs is London Liverpool Street, 3.7 km south-west, with about 603 scheduled stops a day.
Of the 2 operators with enough records at Hackney Downs, Greater Anglia is the least punctual, at 89.2%.
Over three full railway years Greater Anglia at Hackney Downs has got worse each time, from 94.3% within three minutes in 2023-24 to 92.1% in 2024-25 and 90.2% in 2025-26.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,879 | 91.2% | 2.5% |
| Period 6 of 2026-27 | 1,916 | 90.5% | 3.6% |
| Period 5 of 2026-27 | 1,923 | 88.2% | 2.1% |
| Period 4 of 2026-27 | 1,985 | 89.7% | 1.8% |
| Period 3 of 2026-27 | 1,902 | 88.4% | 3.3% |
| Period 2 of 2026-27 | 1,855 | 91.2% | 1.1% |
| Period 1 of 2026-27 | 2,255 | 91.2% | 3.0% |
| Period 13 of 2025-26 | 1,962 | 88.4% | 2.4% |
| Period 12 of 2025-26 | 1,903 | 88.4% | 3.4% |
| Period 11 of 2025-26 | 1,960 | 90.6% | 1.2% |
| Period 10 of 2025-26 | 1,344 | 88.5% | 1.4% |
| Period 9 of 2025-26 | 1,969 | 84.3% | 2.0% |
| Period 8 of 2025-26 | 1,993 | 88.3% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hackney Downs
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 108,976 | 93.0% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out