Northern had 36,081 scheduled stops at Guide Bridge in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 87.6% of recorded arrivals came within three minutes and 2.1% of stops were cancelled.
Northern trains at Guide Bridge also serve Fairfield (2.1 km west, 89.1% on time, 2.2% cancelled), Hyde North (2.1 km south-east, 91.6% on time, 2.1% cancelled), Denton (2.2 km south-west, – on time, – cancelled), Ashton-under-Lyne (2.3 km north-east, 81.6% on time, 3.4% cancelled), Flowery Field (2.6 km south-east, 87.8% on time, 2.1% cancelled) and Hyde Central (3.1 km south-east, 90.9% on time, 2.1% cancelled), which are the stations on its network closest to Guide Bridge.
Within 30 km of here, Northern runs best at Rose Hill Marple, 9.0 km south (93.3%), and worst at Moses Gate, 21.1 km north-west (52.6%).
The busiest Northern station within 30 km of Guide Bridge is Manchester Piccadilly, 7.8 km west, with about 508 scheduled stops a day.
Of the 1 operators with enough records at Guide Bridge, Northern is the most punctual, at 87.6%.
For Northern, Guide Bridge is the 65th best of 493 ranked stations. Its 87.6% here is 9.0 percentage points above the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,824 | 89.6% | 1.2% |
| Period 6 of 2026-27 | 2,820 | 89.7% | 1.8% |
| Period 5 of 2026-27 | 2,486 | 87.2% | 1.2% |
| Period 4 of 2026-27 | 2,780 | 85.2% | 2.2% |
| Period 3 of 2026-27 | 2,625 | 89.4% | 0.7% |
| Period 2 of 2026-27 | 2,811 | 89.3% | 1.9% |
| Period 1 of 2026-27 | 3,251 | 89.8% | 4.5% |
| Period 13 of 2025-26 | 3,072 | 89.8% | 0.9% |
| Period 12 of 2025-26 | 2,484 | 90.2% | 1.7% |
| Period 11 of 2025-26 | 2,729 | 90.4% | 1.0% |
| Period 10 of 2025-26 | 2,569 | 87.4% | 4.2% |
| Period 9 of 2025-26 | 2,805 | 77.8% | 3.7% |
| Period 8 of 2025-26 | 2,825 | 82.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Guide Bridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out