Northern had 11,376 scheduled stops at Grindleford in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 71.8% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Northern trains at Grindleford also serve Hathersage (2.8 km north-west, 69.7% on time, 1.9% cancelled), Bamford (5.6 km north-west, 68.2% on time, 1.9% cancelled), Dore and Totley (7.8 km east, 72.2% on time, 2.0% cancelled), Hope (Derbyshire) (8.2 km north-west, 69.5% on time, 1.9% cancelled), Dronfield (10.5 km east, 77.1% on time, 1.7% cancelled) and Sheffield (13.6 km north-east, 76.0% on time, 2.9% cancelled), which are the stations on its network closest to Grindleford.
Within 30 km of here, Northern runs best at Buxton, 19.7 km west (91.7%), and worst at Bamford, 5.6 km north-west (68.2%).
The busiest Northern station within 30 km of Grindleford is Sheffield, 13.6 km north-east, with about 320 scheduled stops a day.
Of the 2 operators with enough records at Grindleford, Northern is the most punctual, at 71.8%.
Northern at Grindleford has slipped a little, from 74.4% within three minutes in the previous 13 periods to 71.8% in the latest 13, a fall of 2.6 percentage points. Cancellations fell to 2.0% of scheduled stops from 3.4%, which is 1.4 percentage points fewer.
Over three full railway years Northern at Grindleford has improved each time, from 68.3% within three minutes in 2023-24 to 74.5% in 2024-25 and 74.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 876 | 72.0% | 1.3% |
| Period 6 of 2026-27 | 876 | 72.5% | 0.9% |
| Period 5 of 2026-27 | 880 | 66.9% | 3.3% |
| Period 4 of 2026-27 | 876 | 71.1% | 0.5% |
| Period 3 of 2026-27 | 875 | 65.0% | 0.8% |
| Period 2 of 2026-27 | 880 | 69.9% | 4.2% |
| Period 1 of 2026-27 | 1,004 | 76.8% | 2.9% |
| Period 13 of 2025-26 | 844 | 77.0% | 0.6% |
| Period 12 of 2025-26 | 880 | 76.7% | 0.3% |
| Period 11 of 2025-26 | 833 | 79.5% | 2.2% |
| Period 10 of 2025-26 | 796 | 68.6% | 3.3% |
| Period 9 of 2025-26 | 880 | 66.5% | 3.2% |
| Period 8 of 2025-26 | 876 | 69.8% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Grindleford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 660 | 63.8% | 3.3% |
| TransPennine Express | 2 | – | – |