Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Gathurst

GSTNorth WestManaged by Northern Trains

On time, last 13 periods66.1%Great Britain: 83.6%
Cancelled4.0%Great Britain: 3.2%
Stops a day56Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Gathurst has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 20,449 scheduled stops, about 56 a day. In those periods 66.1% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.

Gathurst opened on 9 April 1855, 171 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Gathurst is the newest; the oldest, Wigan North Western, opened in 1832.

The nearest stations to Gathurst are Appley Bridge (2.7 km north-west), Orrell (3.4 km south), Pemberton (3.6 km south-east), Wigan Wallgate (4.3 km east) and Wigan North Western (4.4 km south-east). 15 stations lie within 10 km in all. At 66.1%, Gathurst is less punctual than all of them; the best of the five, Orrell, manages 86.9%.

Gathurst takes its name from a Village called Gathurst, and the station stands 0.2 km from its centre.

Northern is the only operator serving Gathurst. Here it manages 66.1% within three minutes, 12.5 percentage points worse than its 78.6% across its whole network.

Gathurst recorded about 91,206 entries and exits in 2025-26, ranking 1848th nationally. That is roughly 4 passengers for every scheduled stop.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 6 of 2026-27: 66.1%
This pageGreat Britain
0%5%10%15%20%Period 1 of 2023-24: 1.9%Period 2 of 2023-24: 3.6%Period 3 of 2023-24: 3.4%Period 4 of 2023-24: 1.7%Period 5 of 2023-24: 5.6%Period 6 of 2023-24: 4.4%Period 7 of 2023-24: 4.3%Period 8 of 2023-24: 5.5%Period 9 of 2023-24: 8.3%Period 10 of 2023-24: 9.3%Period 11 of 2023-24: 5.1%Period 12 of 2023-24: 4.0%Period 13 of 2023-24: 6.1%Period 1 of 2024-25: 4.1%Period 2 of 2024-25: 7.2%Period 3 of 2024-25: 9.7%Period 4 of 2024-25: 8.8%Period 5 of 2024-25: 12.7%Period 6 of 2024-25: 12.7%Period 7 of 2024-25: 10.5%Period 8 of 2024-25: 9.6%Period 9 of 2024-25: 9.7%Period 10 of 2024-25: 6.2%Period 11 of 2024-25: 16.2%Period 12 of 2024-25: 3.8%Period 13 of 2024-25: 5.9%Period 1 of 2025-26: 4.0%Period 2 of 2025-26: 3.1%Period 3 of 2025-26: 4.1%Period 4 of 2025-26: 3.1%Period 5 of 2025-26: 4.8%Period 6 of 2025-26: 4.7%Period 7 of 2025-26: 3.5%Period 8 of 2025-26: 3.6%Period 9 of 2025-26: 4.5%Period 10 of 2025-26: 6.3%Period 11 of 2025-26: 3.4%Period 12 of 2025-26: 5.3%Period 13 of 2025-26: 5.5%Period 1 of 2026-27: 2.2%Period 2 of 2026-27: 3.3%Period 3 of 2026-27: 2.7%Period 4 of 2026-27: 2.9%Period 5 of 2026-27: 7.6%Period 6 of 2026-27: 2.8%Period 7 of 2026-27: 2.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern20,44966.1%4.0%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,596–2.6%
Period 6 of 2026-271,58066.1%2.8%
Period 5 of 2026-271,243–7.6%
Period 4 of 2026-271,588–2.9%
Period 3 of 2026-271,437–2.7%
Period 2 of 2026-271,596–3.3%
Period 1 of 2026-271,852–2.2%
Period 13 of 2025-261,739–5.5%
Period 12 of 2025-261,596–5.3%
Period 11 of 2025-261,596–3.4%
Period 10 of 2025-261,457–6.3%
Period 9 of 2025-261,577–4.5%
Period 8 of 2025-261,592–3.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out