Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Furze Platt

FZPSouth EastManaged by Great Western Railway

On time, last 13 periods90.2%Great Britain: 83.6%
Cancelled2.6%Great Britain: 3.2%
Stops a day46Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Furze Platt has usable figures for 5 of the last 13 four-week periods to Period 7 of 2026-27, covering 16,924 scheduled stops, about 46 a day. In those periods 90.2% of stops arrived within three minutes of the timetable and 2.6% of scheduled stops were cancelled.

Furze Platt opened on 5 July 1937, 89 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Furze Platt is the newest; the oldest, Taplow, opened in 1838.

The nearest stations to Furze Platt are Maidenhead (1.7 km south), Cookham (2.7 km north), Taplow (3.4 km east), Marlow (5.0 km north-west) and Bourne End (5.0 km north). 9 stations lie within 10 km in all. Of the five, Marlow is the most punctual at 95.7% and Taplow the least at 82.7%, with Furze Platt on 90.2%.

Furze Platt takes its name from a suburb called Furze Platt, and the station stands 0.6 km from its centre.

For Furze Platt, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 85.4% of stops arrived within three minutes of the timetable. The strongest was Period 7 of 2026-27, at 93.7%, which is 8.3 percentage points higher.

Great Western Railway is the only operator serving Furze Platt. Here it manages 90.2% within three minutes, 14.5 percentage points better than its 75.7% across its whole network.

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 7 of 2025-26: 88.3%Period 13 of 2025-26: 90.3%Period 1 of 2026-27: 93.2%Period 4 of 2026-27: 85.4%Period 5 of 2026-27: 88.2%Period 7 of 2026-27: 93.7%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.4%Period 2 of 2023-24: 1.6%Period 3 of 2023-24: 4.1%Period 4 of 2023-24: 2.6%Period 5 of 2023-24: 1.1%Period 6 of 2023-24: 2.0%Period 7 of 2023-24: 1.6%Period 8 of 2023-24: 2.0%Period 9 of 2023-24: 3.2%Period 10 of 2023-24: 3.6%Period 11 of 2023-24: 2.8%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 1.5%Period 1 of 2024-25: 1.8%Period 2 of 2024-25: 1.2%Period 3 of 2024-25: 2.4%Period 4 of 2024-25: 1.5%Period 5 of 2024-25: 1.5%Period 6 of 2024-25: 1.6%Period 7 of 2024-25: 1.4%Period 8 of 2024-25: 1.2%Period 9 of 2024-25: 2.6%Period 10 of 2024-25: 3.0%Period 11 of 2024-25: 4.5%Period 12 of 2024-25: 0.5%Period 13 of 2024-25: 3.7%Period 1 of 2025-26: 3.2%Period 2 of 2025-26: 2.8%Period 3 of 2025-26: 2.1%Period 4 of 2025-26: 3.7%Period 5 of 2025-26: 2.2%Period 6 of 2025-26: 2.9%Period 7 of 2025-26: 0.8%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 1.3%Period 10 of 2025-26: 1.7%Period 11 of 2025-26: 2.9%Period 12 of 2025-26: 0.8%Period 13 of 2025-26: 2.4%Period 1 of 2026-27: 2.3%Period 2 of 2026-27: 3.6%Period 3 of 2026-27: 4.5%Period 4 of 2026-27: 2.2%Period 5 of 2026-27: 3.9%Period 6 of 2026-27: 3.6%Period 7 of 2026-27: 1.8%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway16,92490.2%2.6%

Operators with their own page for this station are linked to it.

Late train at Furze Platt? Delay Repay

These operators call at Furze Platt and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,29593.7%1.8%
Period 6 of 2026-271,295–3.6%
Period 5 of 2026-271,29588.2%3.9%
Period 4 of 2026-271,29585.4%2.2%
Period 3 of 2026-271,295–4.5%
Period 2 of 2026-271,282–3.6%
Period 1 of 2026-271,46093.2%2.3%
Period 13 of 2025-261,42790.3%2.4%
Period 12 of 2025-261,295–0.8%
Period 11 of 2025-261,295–2.9%
Period 10 of 2025-261,100–1.7%
Period 9 of 2025-261,295–1.3%
Period 8 of 2025-261,295–2.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out