Great Western Railway at Frome
All trains at FromeGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 11,083 scheduled stops at Frome in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 69.3% of recorded arrivals came within three minutes and 4.9% of stops were cancelled.
Great Western Railway trains at Frome also serve Dilton Marsh (7.5 km east, – on time, 7.0% cancelled), Westbury (8.8 km north-east, 69.5% on time, 4.5% cancelled), Warminster (9.5 km east, 71.4% on time, 5.4% cancelled), Trowbridge (12.3 km north-east, 74.3% on time, 4.7% cancelled), Avoncliff (12.7 km north, 77.6% on time, 4.9% cancelled) and Freshford (12.8 km north, 76.7% on time, 4.8% cancelled), which are the stations on its network closest to Frome.
Within 30 km of here, Great Western Railway runs best at Avoncliff, 12.7 km north (77.6%), and worst at Castle Cary, 20.5 km south-west (54.0%).
The busiest Great Western Railway station within 30 km of Frome is Bath Spa, 17.0 km north, with about 157 scheduled stops a day.
Of the 2 operators with enough records at Frome, Great Western Railway is the least punctual, at 69.3%.
For Great Western Railway, Frome is the 158th best of 210 ranked stations. Its 69.3% here is 6.4 percentage points below the 75.7% across the whole network.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 843 | 68.2% | 4.2% |
| Period 6 of 2026-27 | 864 | 65.7% | 3.9% |
| Period 5 of 2026-27 | 869 | 60.9% | 5.2% |
| Period 4 of 2026-27 | 867 | 61.1% | 7.2% |
| Period 3 of 2026-27 | 869 | 67.9% | 9.7% |
| Period 2 of 2026-27 | 846 | 65.5% | 6.0% |
| Period 1 of 2026-27 | 895 | 76.9% | 1.9% |
| Period 13 of 2025-26 | 936 | 78.6% | 3.3% |
| Period 12 of 2025-26 | 851 | 81.1% | 1.3% |
| Period 11 of 2025-26 | 847 | 78.5% | 3.8% |
| Period 10 of 2025-26 | 740 | 71.0% | 5.0% |
| Period 9 of 2025-26 | 854 | 63.3% | 6.8% |
| Period 8 of 2025-26 | 802 | 58.9% | 5.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Frome
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 2,420 | 77.6% | 7.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out