Exton
EXNSouth WestManaged by Great Western Railway
How this station is performing
Exton has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 18,150 scheduled stops, about 50 a day. In those periods 72.8% of stops arrived within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Exton opened on 1 May 1861, 165 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Starcross is the oldest (1846) and Newcourt the newest (2015), with Exton in between.
The nearest stations to Exton are Lympstone Commando (0.6 km south), Lympstone Village (2.3 km south), Topsham (2.4 km north-west), Newcourt (4.3 km north-west) and Starcross (4.5 km south). 17 stations lie within 10 km in all. At 72.8%, Exton is less punctual than all of them; the best of the five, Lympstone Village, manages 85.2%.
Exton is one of 4 stations named after a Village called Exton; this one stands 0.5 km from its centre.
For Exton, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 64.6% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2023-24, at 90.5%, which is 25.9 percentage points higher. Cancellations peaked at 7.0% of scheduled stops in Period 4 of 2026-27, against 3.4% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 18,150 | 72.8% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Exton? Delay Repay
These operators call at Exton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,404 | 81.6% | 3.4% |
| Period 6 of 2026-27 | 1,398 | 73.0% | 2.9% |
| Period 5 of 2026-27 | 1,394 | 64.6% | 3.9% |
| Period 4 of 2026-27 | 1,362 | 67.1% | 7.0% |
| Period 3 of 2026-27 | 1,398 | 72.0% | 3.9% |
| Period 2 of 2026-27 | 1,398 | 64.8% | 3.6% |
| Period 1 of 2026-27 | 1,618 | 80.1% | 2.0% |
| Period 13 of 2025-26 | 1,535 | 76.9% | 2.7% |
| Period 12 of 2025-26 | 1,259 | – | 1.9% |
| Period 11 of 2025-26 | 1,395 | – | 2.2% |
| Period 10 of 2025-26 | 1,275 | – | 5.5% |
| Period 9 of 2025-26 | 1,396 | – | 2.9% |
| Period 8 of 2025-26 | 1,318 | – | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out