Evesham
EVEWest MidlandsManaged by Great Western Railway
How this station is performing
Evesham had 14,637 scheduled stops to Period 7 of 2026-27, about 40 a day. 58.0% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Evesham opened on 3 May 1852, 174 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ashchurch for Tewkesbury is the oldest (1840) and Worcestershire Parkway the newest (2020), with Evesham in between.
The nearest stations to Evesham are Honeybourne (7.8 km east), Pershore (9.2 km north-west), Ashchurch for Tewkesbury (15.6 km south-west), Worcestershire Parkway (15.8 km north-west) and Wilmcote (19.0 km north-east). 2 stations lie within 10 km in all. Of the five, Wilmcote is the most punctual at 87.3% and Pershore the least at 57.8%, with Evesham on 58.0%.
Evesham takes its name from a market town called Evesham, home to about 27,684 people, and the station stands 1.0 km from its centre.
Evesham has slipped sharply. 58.0% of stops came within three minutes of the timetable in the latest 13 periods, 9.4 percentage points worse than the 67.4% recorded in the 13 before. Cancellations held steady at 4.4% of scheduled stops, against 4.4% before.
Compared with 3 stations of a similar size in West Midlands, Evesham is the least punctual, at 58.0%. All of them are ahead, including Codsall (73.1%), Colwall (71.3%) and Ledbury (71.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 14,637 | 58.0% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Evesham? Delay Repay
These operators call at Evesham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,117 | 63.4% | 3.7% |
| Period 6 of 2026-27 | 1,132 | 52.2% | 5.7% |
| Period 5 of 2026-27 | 1,119 | 52.0% | 8.7% |
| Period 4 of 2026-27 | 1,120 | 53.9% | 6.2% |
| Period 3 of 2026-27 | 1,126 | 60.9% | 6.3% |
| Period 2 of 2026-27 | 1,120 | 64.7% | 2.9% |
| Period 1 of 2026-27 | 1,286 | 65.3% | 3.9% |
| Period 13 of 2025-26 | 1,245 | 72.8% | 2.2% |
| Period 12 of 2025-26 | 1,047 | 72.7% | 2.5% |
| Period 11 of 2025-26 | 1,076 | 67.3% | 2.3% |
| Period 10 of 2025-26 | 1,023 | 42.0% | 5.4% |
| Period 9 of 2025-26 | 1,120 | 33.3% | 3.0% |
| Period 8 of 2025-26 | 1,106 | 48.9% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out