Elton and Orston
ELOEast MidlandsManaged by East Midlands Railway
How this station is performing
Elton and Orston has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 630 scheduled stops, about 2 a day. In those periods 87.1% of stops arrived within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Elton and Orston opened on 15 July 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Elton and Orston is the newest; the oldest, Thurgarton, opened in 1846.
The nearest stations to Elton and Orston are Aslockton (2.9 km west), Bottesford (4.1 km east), Bingham (6.4 km west), Thurgarton (11.2 km north-west) and Lowdham (11.3 km north-west). 3 stations lie within 10 km in all. At 87.1%, Elton and Orston is more punctual than every one of them; the best of the five, Thurgarton, manages 85.2%.
Elton and Orston is named after Elton on the Hill, a Village, home to about 114 people, but the station stands 1.3 km from its centre.
East Midlands Railway is the only operator serving Elton and Orston. Here it manages 87.1% within three minutes, 12.5 percentage points better than its 74.6% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 630 | 87.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Elton and Orston? Delay Repay
These operators call at Elton and Orston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 48 | – | – |
| Period 6 of 2026-27 | 48 | – | – |
| Period 5 of 2026-27 | 48 | – | – |
| Period 4 of 2026-27 | 48 | – | – |
| Period 3 of 2026-27 | 48 | – | – |
| Period 2 of 2026-27 | 48 | – | – |
| Period 1 of 2026-27 | 56 | 87.1% | 1.8% |
| Period 13 of 2025-26 | 52 | – | – |
| Period 12 of 2025-26 | 48 | – | – |
| Period 11 of 2025-26 | 47 | – | – |
| Period 10 of 2025-26 | 43 | – | – |
| Period 9 of 2025-26 | 48 | – | – |
| Period 8 of 2025-26 | 48 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out