Northern at Edge Hill
How this operator is doing here
Northern had 45,720 scheduled stops at Edge Hill in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 81.0% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
Northern trains at Edge Hill also serve Wavertree Technology Park (1.6 km east, 80.9% on time, 3.3% cancelled), Liverpool Lime Street (2.1 km west, 78.5% on time, 2.3% cancelled), Mossley Hill (3.4 km south-east, 77.7% on time, 3.5% cancelled), Broad Green (3.6 km east, 79.4% on time, 3.2% cancelled), West Allerton (4.6 km south-east, 75.3% on time, 3.6% cancelled) and Roby (6.1 km east, 81.4% on time, 3.3% cancelled), which are the stations on its network closest to Edge Hill.
Within 30 km of here, Northern runs best at Thatto Heath, 13.0 km east (90.7%), and worst at Bescar Lane, 24.7 km north (64.9%).
The busiest Northern station within 30 km of Edge Hill is Liverpool Lime Street, 2.1 km west, with about 193 scheduled stops a day.
Of the 1 operators with enough records at Edge Hill, Northern is the most punctual, at 81.0%.
For Northern, Edge Hill is the 220th best of 493 ranked stations. Its 81.0% here is 2.4 percentage points above the 78.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,520 | 82.0% | 2.0% |
| Period 6 of 2026-27 | 3,508 | 83.5% | 1.8% |
| Period 5 of 2026-27 | 3,504 | 82.8% | 4.7% |
| Period 4 of 2026-27 | 3,519 | 82.3% | 2.2% |
| Period 3 of 2026-27 | 3,218 | 82.9% | 3.0% |
| Period 2 of 2026-27 | 3,383 | 82.5% | 2.4% |
| Period 1 of 2026-27 | 4,092 | 84.2% | 2.1% |
| Period 13 of 2025-26 | 3,778 | 81.6% | 2.6% |
| Period 12 of 2025-26 | 3,528 | 84.6% | 2.3% |
| Period 11 of 2025-26 | 3,501 | 83.6% | 1.4% |
| Period 10 of 2025-26 | 3,179 | 77.6% | 7.1% |
| Period 9 of 2025-26 | 3,485 | 70.4% | 4.4% |
| Period 8 of 2025-26 | 3,505 | 73.8% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out