Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Transport for Wales at East Didsbury

All trains at East DidsburyTransport for Wales across BritainNorth West

On time, last 13 periods60.1%Whole station: 65.8%
Cancelled7.6%Whole station: 7.0%
Scheduled stops11,014Of 34,972 at the station

How this operator is doing here

Transport for Wales had 11,014 scheduled stops at East Didsbury in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 60.1% of recorded arrivals came within three minutes and 7.6% of stops were cancelled.

Transport for Wales trains at East Didsbury also serve Stockport (3.9 km east, 68.6% on time, 6.0% cancelled), Manchester Airport (5.9 km south-west, 78.4% on time, 6.9% cancelled), Manchester Oxford Road (7.3 km north, 63.7% on time, 1.8% cancelled), Manchester Piccadilly (7.6 km north, 68.3% on time, 4.9% cancelled), Wilmslow (9.1 km south, 68.6% on time, 4.6% cancelled) and Eccles (Manchester) (11.3 km north-west, – on time, – cancelled), which are the stations on its network closest to East Didsbury.

Within 30 km of here, Transport for Wales runs best at Manchester Airport, 5.9 km south-west (78.4%), and worst at Manchester Oxford Road, 7.3 km north (63.7%).

The busiest Transport for Wales station within 30 km of East Didsbury is Manchester Piccadilly, 7.6 km north, with about 68 scheduled stops a day.

Transport for Wales at East Didsbury has slipped sharply. 60.1% of stops came within three minutes of the timetable in the latest 13 periods, 6.9 percentage points worse than the 67.0% recorded in the 13 before. Cancellations rose to 7.6% of scheduled stops from 5.9%, which is 1.7 percentage points more.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 75.7%Period 2 of 2023-24: 67.0%Period 3 of 2023-24: 65.2%Period 4 of 2023-24: 65.7%Period 5 of 2023-24: 62.7%Period 6 of 2023-24: 71.5%Period 7 of 2023-24: 69.7%Period 8 of 2023-24: 66.8%Period 9 of 2023-24: 58.0%Period 10 of 2023-24: 65.7%Period 11 of 2023-24: 66.4%Period 12 of 2023-24: 72.4%Period 13 of 2023-24: 72.9%Period 1 of 2024-25: 70.8%Period 2 of 2024-25: 75.8%Period 3 of 2024-25: 69.2%Period 4 of 2024-25: 74.1%Period 5 of 2024-25: 66.4%Period 6 of 2024-25: 57.3%Period 7 of 2024-25: 60.1%Period 8 of 2024-25: 64.0%Period 9 of 2024-25: 58.8%Period 10 of 2024-25: 62.4%Period 11 of 2024-25: 69.2%Period 12 of 2024-25: 65.8%Period 13 of 2024-25: 81.4%Period 1 of 2025-26: 69.1%Period 2 of 2025-26: 64.5%Period 3 of 2025-26: 69.4%Period 4 of 2025-26: 63.3%Period 5 of 2025-26: 63.6%Period 6 of 2025-26: 72.7%Period 7 of 2025-26: 65.9%Period 8 of 2025-26: 61.6%Period 9 of 2025-26: 48.4%Period 10 of 2025-26: 60.3%Period 11 of 2025-26: 66.2%Period 12 of 2025-26: 66.7%Period 13 of 2025-26: 64.6%Period 1 of 2026-27: 65.2%Period 2 of 2026-27: 65.2%Period 3 of 2026-27: 53.6%Period 4 of 2026-27: 58.5%Period 5 of 2026-27: 57.2%Period 6 of 2026-27: 53.7%Period 7 of 2026-27: 59.3%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 4.7%Period 2 of 2023-24: 1.4%Period 3 of 2023-24: 6.3%Period 4 of 2023-24: 9.8%Period 5 of 2023-24: 3.7%Period 6 of 2023-24: 3.7%Period 7 of 2023-24: 8.8%Period 8 of 2023-24: 4.5%Period 9 of 2023-24: 4.9%Period 10 of 2023-24: 2.8%Period 11 of 2023-24: 8.2%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 2.1%Period 1 of 2024-25: 5.1%Period 2 of 2024-25: 3.7%Period 3 of 2024-25: 2.6%Period 4 of 2024-25: 3.8%Period 5 of 2024-25: 4.9%Period 6 of 2024-25: 5.6%Period 7 of 2024-25: 5.0%Period 8 of 2024-25: 5.6%Period 9 of 2024-25: 6.0%Period 10 of 2024-25: 8.3%Period 11 of 2024-25: 7.9%Period 12 of 2024-25: 7.0%Period 13 of 2024-25: 3.2%Period 1 of 2025-26: 2.5%Period 2 of 2025-26: 3.2%Period 3 of 2025-26: 10.2%Period 4 of 2025-26: 5.0%Period 5 of 2025-26: 8.1%Period 6 of 2025-26: 2.8%Period 7 of 2025-26: 6.9%Period 8 of 2025-26: 6.8%Period 9 of 2025-26: 8.7%Period 10 of 2025-26: 3.0%Period 11 of 2025-26: 4.8%Period 12 of 2025-26: 4.7%Period 13 of 2025-26: 5.2%Period 1 of 2026-27: 4.8%Period 2 of 2026-27: 6.5%Period 3 of 2026-27: 11.0%Period 4 of 2026-27: 11.4%Period 5 of 2026-27: 8.6%Period 6 of 2026-27: 13.2%Period 7 of 2026-27: 9.3%2023-242024-252025-262026-27

See how Transport for Wales Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2786259.3%9.3%
Period 6 of 2026-2788453.7%13.2%
Period 5 of 2026-2785157.2%8.6%
Period 4 of 2026-2787258.5%11.4%
Period 3 of 2026-2787953.6%11.0%
Period 2 of 2026-2783365.2%6.5%
Period 1 of 2026-271,00065.2%4.8%
Period 13 of 2025-2686764.6%5.2%
Period 12 of 2025-2661466.7%4.7%
Period 11 of 2025-2685066.2%4.8%
Period 10 of 2025-2681060.3%3.0%
Period 9 of 2025-2682448.4%8.7%
Period 8 of 2025-2686861.6%6.8%

Time of year

50%60%70%80%90%P1: 69.9%1P2: 68.4%2P3: 64.3%3P4: 65.5%4P5: 62.6%5P6: 63.9%6P7: 63.6%7P8: 64.1%8P9: 55.0%9P10: 62.8%10P11: 67.3%11P12: 68.6%12P13: 73.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at East Didsbury

OperatorScheduled stopsWithin 3 minCancelled
Northern23,95868.4%6.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out