Dullingham
DULEast of EnglandManaged by Greater Anglia
How this station is performing
Dullingham had 8,264 scheduled stops to Period 7 of 2026-27, about 23 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Dullingham opened on 4 April 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Waterbeach is the oldest (1845) and Cambridge North the newest (2017), with Dullingham in between.
The nearest stations to Dullingham are Newmarket (5.0 km north-east), Kennett (12.0 km north-east), Waterbeach (13.4 km north-west), Cambridge North (14.3 km west) and Soham (15.1 km north). 1 stations lie within 10 km in all. Of the five, Newmarket is the most punctual at 89.9% and Soham the least at 66.8%, with Dullingham on 86.5%.
Dullingham takes its name from a Village called Dullingham, home to about 835 people, and the station stands 1.4 km from its centre.
Dullingham has slipped sharply. 86.5% of stops came within three minutes of the timetable in the latest 13 periods, 6.1 percentage points worse than the 92.6% recorded in the 13 before. Cancellations rose to 2.5% of scheduled stops from 1.1%, which is 1.4 percentage points more.
1 of 3 stations of a similar size in East of England are more punctual than Dullingham on 86.5%. The comparison group includes Whittlesea (67.4%), Manea (65.7%) and Kennett (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 8,264 | 86.5% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Dullingham? Delay Repay
These operators call at Dullingham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 698 | 89.5% | 1.4% |
| Period 6 of 2026-27 | 688 | 90.5% | 1.7% |
| Period 5 of 2026-27 | 701 | 84.2% | 1.4% |
| Period 4 of 2026-27 | 662 | 63.3% | 8.6% |
| Period 3 of 2026-27 | 631 | 79.6% | 5.9% |
| Period 2 of 2026-27 | 673 | 85.9% | 1.8% |
| Period 1 of 2026-27 | 654 | 90.0% | 2.0% |
| Period 13 of 2025-26 | 651 | 91.0% | 0.8% |
| Period 12 of 2025-26 | 643 | 91.9% | 1.9% |
| Period 11 of 2025-26 | 627 | 84.3% | 3.2% |
| Period 10 of 2025-26 | 400 | 88.4% | 1.3% |
| Period 9 of 2025-26 | 614 | 94.1% | 1.3% |
| Period 8 of 2025-26 | 622 | 90.9% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Whittlesea | 7,848 | 67.4% | 2.9% |
| Manea | 7,549 | 65.7% | 2.3% |
| Kennett | 9,201 | 89.8% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out