Drayton Green
DRGLondonManaged by Great Western Railway
How this station is performing
Drayton Green has usable figures for 3 of the last 13 four-week periods to Period 7 of 2026-27, covering 20,207 scheduled stops, about 56 a day. In those periods 96.2% of stops arrived within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Drayton Green opened on 1 March 1905, 121 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hanwell is the oldest (1838) and South Greenford the newest (1926), with Drayton Green in between.
The nearest stations to Drayton Green are Castle Bar Park (0.7 km north), West Ealing (0.7 km south-east), Hanwell (0.8 km south-west), South Greenford (1.9 km north) and Ealing Broadway (2.0 km east). 60 stations lie within 10 km in all. Of the five, South Greenford is the most punctual at 97.3% and Ealing Broadway the least at 82.9%, with Drayton Green on 96.2%.
For Drayton Green, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 93.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 98.5%, which is 5.3 percentage points higher. Cancellations peaked at 9.6% of scheduled stops in Period 5 of 2026-27, against 4.3% over the latest 13 periods.
Great Western Railway is the only operator serving Drayton Green. Here it manages 96.2% within three minutes, 20.5 percentage points better than its 75.7% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,207 | 96.2% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Drayton Green? Delay Repay
These operators call at Drayton Green and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,536 | 93.2% | 7.5% |
| Period 6 of 2026-27 | 1,536 | – | 5.1% |
| Period 5 of 2026-27 | 1,534 | – | 9.6% |
| Period 4 of 2026-27 | 1,536 | – | 4.2% |
| Period 3 of 2026-27 | 1,535 | – | 4.6% |
| Period 2 of 2026-27 | 1,536 | – | 3.9% |
| Period 1 of 2026-27 | 1,792 | 98.5% | 3.4% |
| Period 13 of 2025-26 | 1,664 | – | 1.1% |
| Period 12 of 2025-26 | 1,536 | – | 2.1% |
| Period 11 of 2025-26 | 1,536 | – | 4.6% |
| Period 10 of 2025-26 | 1,394 | 98.1% | 3.7% |
| Period 9 of 2025-26 | 1,536 | – | 4.6% |
| Period 8 of 2025-26 | 1,536 | – | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out