Diss
DISEast of EnglandManaged by Greater Anglia
How this station is performing
Diss had 22,363 scheduled stops to Period 7 of 2026-27, about 61 a day. 90.7% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Diss opened on 2 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Diss is the newest; the oldest, Eccles Road, opened in 1845.
Diss is remote: its nearest neighbours are Eccles Road (15.0 km north-west), Harling Road (17.1 km north-west), Attleborough (17.1 km north-west), Spooner Row (18.1 km north) and Elmswell (20.8 km south-west). At 90.7%, Diss is more punctual than every one of them; the best of the five, Elmswell, manages 84.8%.
Diss takes its name from a town called Diss, home to about 8,509 people, and the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Diss was Period 9 of 2023-24, at 79.8%, some time before the latest year. The strongest was Period 5 of 2023-24, at 94.2%, and the two are 14.4 percentage points apart. Cancellations peaked at 5.2% of scheduled stops in Period 8 of 2023-24, against 1.2% over the latest 13 periods.
1 of 3 stations of a similar size in East of England are more punctual than Diss on 90.7%. The comparison group includes Thetford (68.9%), Lowestoft (96.7%) and Waterbeach (68.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 22,363 | 90.7% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Diss? Delay Repay
These operators call at Diss and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,677 | 89.8% | 0.5% |
| Period 6 of 2026-27 | 1,584 | 87.5% | 0.7% |
| Period 5 of 2026-27 | 1,765 | 90.5% | 0.9% |
| Period 4 of 2026-27 | 1,750 | 91.7% | 1.2% |
| Period 3 of 2026-27 | 1,716 | 88.4% | 1.6% |
| Period 2 of 2026-27 | 1,764 | 90.9% | 1.4% |
| Period 1 of 2026-27 | 1,776 | 91.3% | 1.5% |
| Period 13 of 2025-26 | 1,925 | 91.3% | 2.1% |
| Period 12 of 2025-26 | 1,746 | 93.6% | 0.8% |
| Period 11 of 2025-26 | 1,752 | 91.0% | 1.0% |
| Period 10 of 2025-26 | 1,600 | 90.7% | 1.8% |
| Period 9 of 2025-26 | 1,547 | 89.0% | 0.4% |
| Period 8 of 2025-26 | 1,761 | 92.3% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Thetford | 22,109 | 68.9% | 3.0% |
| Lowestoft | 25,143 | 96.7% | 1.0% |
| Waterbeach | 25,457 | 68.9% | 9.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out