Digby and Sowton
DIGSouth WestManaged by Great Western Railway
How this station is performing
Digby and Sowton has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 24,788 scheduled stops, about 68 a day. In those periods 81.8% of stops arrived within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Digby and Sowton opened on 1 June 1908 and closed to passengers on 27 September 1948. It reopened on 29 May 1995, 31 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Topsham is the oldest (1861) and Marsh Barton the newest (2023), with Digby and Sowton in between.
The nearest stations to Digby and Sowton are Newcourt (1.3 km south), Pinhoe (2.7 km north), Polsloe Bridge (2.7 km north-west), Topsham (3.2 km south) and Marsh Barton (3.5 km west). 14 stations lie within 10 km in all. Of the five, Topsham is the most punctual at 84.4% and Pinhoe the least at 71.0%, with Digby and Sowton on 81.8%.
Digby and Sowton is named after Sowton, a Village, home to about 849 people, but the station stands 2.0 km from its centre.
2 of 3 stations of a similar size in South West are more punctual than Digby and Sowton on 81.8%. The comparison group includes Topsham (84.4%), Exmouth (83.8%) and Newcourt (81.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 24,788 | 81.8% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Digby and Sowton? Delay Repay
These operators call at Digby and Sowton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,912 | 86.9% | 3.1% |
| Period 6 of 2026-27 | 1,906 | 78.9% | 2.4% |
| Period 5 of 2026-27 | 1,901 | 73.3% | 3.9% |
| Period 4 of 2026-27 | 1,854 | 76.8% | 5.4% |
| Period 3 of 2026-27 | 1,906 | 78.0% | 3.7% |
| Period 2 of 2026-27 | 1,906 | 74.2% | 4.0% |
| Period 1 of 2026-27 | 2,197 | 86.6% | 1.7% |
| Period 13 of 2025-26 | 2,099 | 86.2% | 2.4% |
| Period 12 of 2025-26 | 1,787 | 90.2% | 1.5% |
| Period 11 of 2025-26 | 1,894 | 89.1% | 2.1% |
| Period 10 of 2025-26 | 1,728 | 85.6% | 5.2% |
| Period 9 of 2025-26 | 1,904 | – | 2.4% |
| Period 8 of 2025-26 | 1,794 | 78.8% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out