Northern at Davenport
How this operator is doing here
Northern had 23,244 scheduled stops at Davenport in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 82.8% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Northern trains at Davenport also serve Woodsmoor (0.9 km south-east, 83.2% on time, 2.5% cancelled), Stockport (1.8 km north-west, 81.6% on time, 2.4% cancelled), Hazel Grove (2.5 km south-east, 85.2% on time, 2.3% cancelled), Cheadle Hulme (2.9 km south-west, 81.7% on time, 2.6% cancelled), Bramhall (3.5 km south, 81.8% on time, 2.1% cancelled) and Heaton Chapel (4.3 km north-west, 83.5% on time, 2.9% cancelled), which are the stations on its network closest to Davenport.
Within 30 km of here, Northern runs best at Rose Hill Marple, 5.1 km east (93.3%), and worst at Moses Gate, 24.7 km north-west (52.6%).
The busiest Northern station within 30 km of Davenport is Manchester Piccadilly, 10.9 km north-west, with about 508 scheduled stops a day.
Northern at Davenport has slipped a little, from 85.9% within three minutes in the previous 13 periods to 82.8% in the latest 13, a fall of 3.1 percentage points. Cancellations fell to 2.5% of scheduled stops from 3.4%, which is 0.9 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,769 | 80.6% | 1.9% |
| Period 6 of 2026-27 | 1,808 | 83.4% | 0.7% |
| Period 5 of 2026-27 | 1,783 | 78.7% | 2.6% |
| Period 4 of 2026-27 | 1,783 | 80.6% | 1.9% |
| Period 3 of 2026-27 | 1,642 | 81.0% | 2.1% |
| Period 2 of 2026-27 | 1,816 | 81.7% | 3.9% |
| Period 1 of 2026-27 | 2,050 | 86.0% | 5.3% |
| Period 13 of 2025-26 | 1,972 | 87.1% | 1.1% |
| Period 12 of 2025-26 | 1,544 | 88.2% | 0.7% |
| Period 11 of 2025-26 | 1,765 | 83.6% | 2.4% |
| Period 10 of 2025-26 | 1,674 | 83.7% | 4.3% |
| Period 9 of 2025-26 | 1,822 | 79.0% | 4.0% |
| Period 8 of 2025-26 | 1,816 | 83.1% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Davenport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out