Conwy
CNWWalesManaged by TfW Rail
How this station is performing
Conwy has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,026 scheduled stops, about 28 a day. In those periods 77.2% of stops arrived within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Conwy first opened on 1 May 1848. The station passengers use today opened on 29 June 1987, 39 years ago. Of the 5 stations nearest to it with a known opening date, Conwy is the oldest; the next oldest, Llandudno Junction, dates from 1858.
The nearest stations to Conwy are Llandudno Junction (1.5 km east), Deganwy (1.6 km north), Glan Conwy (2.5 km south-east), Llandudno (4.5 km north) and Tal-y-cafn (5.8 km south). 7 stations lie within 10 km in all. Of the five, Llandudno is the most punctual at 89.6% and Glan Conwy the least at 75.1%, with Conwy on 77.2%.
Across the whole run of data, the weakest four-week period for Conwy was Period 9 of 2023-24, at 52.4%, some time before the latest year. The strongest was Period 13 of 2023-24, at 91.6%, and the two are 39.2 percentage points apart.
1 of 3 stations of a similar size in Wales are more punctual than Conwy on 77.2%. The comparison group includes Llanfairfechan (77.2%), Penmaenmawr (75.0%) and Wrexham Central (90.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,026 | 77.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Conwy? Delay Repay
These operators call at Conwy and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 878 | 78.9% | 0.8% |
| Period 6 of 2026-27 | 882 | 71.5% | 2.3% |
| Period 5 of 2026-27 | 881 | 76.8% | 1.6% |
| Period 4 of 2026-27 | 882 | – | 2.2% |
| Period 3 of 2026-27 | 888 | 77.7% | 1.9% |
| Period 2 of 2026-27 | 778 | 75.0% | 1.4% |
| Period 1 of 2026-27 | 785 | 79.6% | 1.1% |
| Period 13 of 2025-26 | 749 | 83.8% | 0.9% |
| Period 12 of 2025-26 | 680 | 85.3% | 1.3% |
| Period 11 of 2025-26 | 673 | 83.2% | 1.6% |
| Period 10 of 2025-26 | 608 | 82.1% | 2.1% |
| Period 9 of 2025-26 | 663 | 66.3% | 2.7% |
| Period 8 of 2025-26 | 679 | 66.0% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llanfairfechan | 10,026 | 77.2% | 1.6% |
| Penmaenmawr | 10,026 | 75.0% | 1.6% |
| Wrexham Central | 9,994 | 90.0% | 6.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out