Avanti at Colwyn Bay
How this operator is doing here
Avanti had 4,775 scheduled stops at Colwyn Bay in the 13 periods to Period 7 of 2026-27, 16% of the station's total. 77.3% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Avanti trains at Colwyn Bay also serve Llandudno Junction (5.7 km west, 75.0% on time, 3.1% cancelled), Rhyl (15.9 km east, 72.3% on time, 2.9% cancelled), Prestatyn (21.6 km east, 71.8% on time, 2.8% cancelled), Bangor (Gwynedd) (28.5 km west, 74.0% on time, 3.5% cancelled), Flint (39.8 km east, 67.5% on time, 2.9% cancelled) and Liverpool Lime Street (51.2 km east, 64.9% on time, 5.8% cancelled), which are the stations on its network closest to Colwyn Bay.
Within 30 km of here, Avanti runs best at Llandudno Junction, 5.7 km west (75.0%), and worst at Prestatyn, 21.6 km east (71.8%).
The busiest Avanti station within 30 km of Colwyn Bay is Llandudno Junction, 5.7 km west, with about 13 scheduled stops a day.
Avanti at Colwyn Bay improved sharply over the past year. In the latest 13 periods 77.3% of stops came within three minutes of the timetable, up 9.5 percentage points from 67.8% in the 13 before. Cancellations fell to 2.8% of scheduled stops from 4.2%, which is 1.4 percentage points fewer.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 368 | 78.3% | 0.8% |
| Period 6 of 2026-27 | 368 | 70.8% | 0.3% |
| Period 5 of 2026-27 | 368 | 76.0% | 5.7% |
| Period 4 of 2026-27 | 368 | – | 6.8% |
| Period 3 of 2026-27 | 345 | 75.1% | 2.0% |
| Period 2 of 2026-27 | 368 | 75.4% | 3.0% |
| Period 1 of 2026-27 | 420 | 86.1% | 2.4% |
| Period 13 of 2025-26 | 406 | 83.2% | 1.0% |
| Period 12 of 2025-26 | 368 | 81.8% | 1.9% |
| Period 11 of 2025-26 | 368 | 81.6% | 3.5% |
| Period 10 of 2025-26 | 319 | 81.0% | 3.4% |
| Period 9 of 2025-26 | 351 | 62.0% | 3.7% |
| Period 8 of 2025-26 | 358 | 68.9% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Colwyn Bay
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 25,870 | 80.2% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out