Great Western Railway at Colwall
All trains at ColwallGreat Western Railway across BritainWest Midlands
How this operator is doing here
Great Western Railway had 2,791 scheduled stops at Colwall in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 74.1% of recorded arrivals came within three minutes and 12.7% of stops were cancelled.
Great Western Railway trains at Colwall also serve Great Malvern (4.2 km north-east, 64.0% on time, 10.1% cancelled), Malvern Link (5.7 km north-east, 68.7% on time, 9.1% cancelled), Ledbury (6.1 km south-west, 62.6% on time, 12.8% cancelled), Worcester Foregate Street (15.8 km north-east, 67.5% on time, 8.3% cancelled), Worcestershire Parkway (15.9 km north-east, 59.4% on time, 4.0% cancelled) and Worcester Shrub Hill (16.3 km north-east, 66.5% on time, 5.5% cancelled), which are the stations on its network closest to Colwall.
Within 30 km of here, Great Western Railway runs best at Gloucester, 25.2 km south (73.0%), and worst at Pershore, 20.2 km east (57.8%).
The busiest Great Western Railway station within 30 km of Colwall is Gloucester, 25.2 km south, with about 99 scheduled stops a day.
Of the 2 operators with enough records at Colwall, Great Western Railway is the most punctual, at 74.1%.
Over three full railway years Great Western Railway at Colwall has improved each time, from 70.2% within three minutes in 2023-24 to 75.3% in 2024-25 and 76.4% in 2025-26.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 209 | 71.4% | 10.0% |
| Period 6 of 2026-27 | 216 | – | 15.3% |
| Period 5 of 2026-27 | 216 | 67.7% | 21.3% |
| Period 4 of 2026-27 | 216 | – | 16.2% |
| Period 3 of 2026-27 | 214 | 70.7% | 18.2% |
| Period 2 of 2026-27 | 216 | 72.3% | 8.3% |
| Period 1 of 2026-27 | 247 | – | 12.1% |
| Period 13 of 2025-26 | 239 | 88.1% | 7.5% |
| Period 12 of 2025-26 | 212 | – | 6.1% |
| Period 11 of 2025-26 | 211 | – | 11.8% |
| Period 10 of 2025-26 | 198 | 70.9% | 20.7% |
| Period 9 of 2025-26 | 209 | – | 8.1% |
| Period 8 of 2025-26 | 188 | – | 10.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Colwall
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 11,393 | 71.0% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out