Collingham
CLMEast MidlandsManaged by East Midlands Railway
How this station is performing
Collingham had 18,549 scheduled stops to Period 7 of 2026-27, about 51 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Collingham opened on 4 August 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Collingham is the oldest; the next oldest, Newark Castle, dates from 1846.
The nearest stations to Collingham are Swinderby (4.2 km north-east), Newark Northgate (7.7 km south-west), Newark Castle (8.3 km south-west), Hykeham (11.5 km north-east) and Rolleston (13.3 km south-west). 3 stations lie within 10 km in all. Of the five, Swinderby is the most punctual at 88.3% and Newark Northgate the least at 69.0%, with Collingham on 84.9%.
Collingham is one of 4 stations named after a Village called Collingham, home to about 3,052 people; this one stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Collingham was Period 9 of 2023-24, at 66.7%, some time before the latest year. The strongest was Period 11 of 2025-26, at 90.1%, and the two are 23.4 percentage points apart. Cancellations peaked at 5.4% of scheduled stops in Period 12 of 2023-24, against 2.1% over the latest 13 periods.
2 of 3 stations of a similar size in East Midlands are more punctual than Collingham on 84.9%. The comparison group includes Sleaford (78.2%), New Mills Newtown (87.5%) and Buxton (91.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 18,549 | 84.9% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Collingham? Delay Repay
These operators call at Collingham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,434 | 85.0% | 1.7% |
| Period 6 of 2026-27 | 1,425 | 84.5% | 1.9% |
| Period 5 of 2026-27 | 1,412 | 82.9% | 2.4% |
| Period 4 of 2026-27 | 1,423 | 84.3% | 2.2% |
| Period 3 of 2026-27 | 1,426 | 81.2% | 2.2% |
| Period 2 of 2026-27 | 1,433 | 83.9% | 2.4% |
| Period 1 of 2026-27 | 1,644 | 88.5% | 1.1% |
| Period 13 of 2025-26 | 1,583 | 89.0% | 2.5% |
| Period 12 of 2025-26 | 1,431 | 87.3% | 2.0% |
| Period 11 of 2025-26 | 1,418 | 90.1% | 2.3% |
| Period 10 of 2025-26 | 1,295 | 87.6% | 1.5% |
| Period 9 of 2025-26 | 1,309 | 76.8% | 2.7% |
| Period 8 of 2025-26 | 1,316 | 81.4% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sleaford | 20,446 | 78.2% | 1.9% |
| New Mills Newtown | 16,618 | 87.5% | 2.1% |
| Buxton | 16,568 | 91.7% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out