Chirk
CRKWalesManaged by TfW Rail
How this station is performing
Chirk had 11,715 scheduled stops to Period 7 of 2026-27, about 32 a day. 76.0% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Chirk opened on 14 October 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ruabon is the oldest (1846) and Wrexham Central the newest (1887), with Chirk in between.
The nearest stations to Chirk are Gobowen (4.9 km south-east), Ruabon (6.2 km north), Wrexham Central (13.3 km north), Wrexham General (13.7 km north) and Gwersyllt (15.8 km north). 2 stations lie within 10 km in all. Of the five, Wrexham Central is the most punctual at 90.0% and Gobowen the least at 72.3%, with Chirk on 76.0%.
Chirk takes its name from a town called Chirk, home to about 4,396 people, and the station stands 1.1 km from its centre.
Across the whole run of data, the weakest four-week period for Chirk was Period 8 of 2024-25, at 50.2%, some time before the latest year. The strongest was Period 12 of 2024-25, at 85.2%, and the two are 35.0 percentage points apart. Cancellations peaked at 8.3% of scheduled stops in Period 9 of 2024-25, against 1.9% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Chirk on 76.0%. The comparison group includes Ruabon (76.2%), Maesteg (76.5%) and Garth (Bridgend County) (72.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,715 | 76.0% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Chirk? Delay Repay
These operators call at Chirk and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 955 | 78.1% | 1.4% |
| Period 6 of 2026-27 | 694 | 72.0% | 2.3% |
| Period 5 of 2026-27 | 656 | 75.7% | 1.8% |
| Period 4 of 2026-27 | 861 | 68.1% | 2.3% |
| Period 3 of 2026-27 | 889 | 79.9% | 1.5% |
| Period 2 of 2026-27 | 954 | 78.8% | 3.9% |
| Period 1 of 2026-27 | 1,092 | 78.7% | 1.5% |
| Period 13 of 2025-26 | 1,049 | 81.7% | 1.0% |
| Period 12 of 2025-26 | 933 | 82.0% | 0.6% |
| Period 11 of 2025-26 | 856 | 79.7% | 2.8% |
| Period 10 of 2025-26 | 873 | 75.0% | 2.5% |
| Period 9 of 2025-26 | 950 | 66.7% | 2.7% |
| Period 8 of 2025-26 | 953 | 67.0% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ruabon | 11,715 | 76.2% | 1.9% |
| Maesteg | 11,621 | 76.5% | 2.8% |
| Garth (Bridgend County) | 11,503 | 72.6% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out