East Midlands Railway at Chinley
All trains at ChinleyEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 1,562 scheduled stops at Chinley in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 50.0% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
East Midlands Railway trains at Chinley also serve Edale (8.9 km east, 56.0% on time, 2.2% cancelled), Hazel Grove (12.5 km west, – on time, – cancelled), Hope (Derbyshire) (14.3 km east, 63.8% on time, 3.3% cancelled), Stockport (16.2 km north-west, 53.9% on time, 4.7% cancelled), Bamford (17.0 km east, – on time, – cancelled) and Hathersage (19.5 km east, 58.6% on time, 3.3% cancelled), which are the stations on its network closest to Chinley.
Within 30 km of here, East Midlands Railway runs best at Stockport, 16.2 km north-west (53.9%), and worst at Manchester Oxford Road, 24.7 km north-west (44.8%).
The busiest East Midlands Railway station within 30 km of Chinley is Manchester Piccadilly, 24.3 km north-west, with about 29 scheduled stops a day.
East Midlands Railway at Chinley has slipped sharply. 50.0% of stops came within three minutes of the timetable in the latest 13 periods, 6.8 percentage points worse than the 56.8% recorded in the 13 before. Cancellations held steady at 3.1% of scheduled stops, against 3.1% before.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 124 | 42.5% | 2.4% |
| Period 6 of 2026-27 | 124 | 41.8% | 0.8% |
| Period 5 of 2026-27 | 114 | 56.5% | 9.6% |
| Period 4 of 2026-27 | 109 | 49.4% | 2.8% |
| Period 3 of 2026-27 | 124 | 49.5% | 5.6% |
| Period 2 of 2026-27 | 124 | 51.8% | 4.0% |
| Period 1 of 2026-27 | 144 | 56.9% | 4.2% |
| Period 13 of 2025-26 | 122 | 48.2% | 0.8% |
| Period 12 of 2025-26 | 101 | 55.6% | 1.0% |
| Period 11 of 2025-26 | 117 | 57.1% | 2.6% |
| Period 10 of 2025-26 | 114 | 50.0% | 3.5% |
| Period 9 of 2025-26 | 121 | 41.9% | 1.7% |
| Period 8 of 2025-26 | 124 | 47.4% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chinley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,102 | 73.9% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out