Greater Anglia at Cheshunt
All trains at CheshuntGreater Anglia across BritainEast of England
How this operator is doing here
Greater Anglia had 77,897 scheduled stops at Cheshunt in the 13 periods to Period 7 of 2026-27, 75% of the station's total. 85.4% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Greater Anglia trains at Cheshunt also serve Waltham Cross (2.0 km south, 87.8% on time, 2.8% cancelled), Enfield Lock (3.6 km south, 86.5% on time, 2.8% cancelled), Broxbourne (5.0 km north, 88.0% on time, 2.5% cancelled), Brimsdown (5.3 km south, 86.4% on time, 2.6% cancelled), Ponders End (6.7 km south, 87.7% on time, 2.5% cancelled) and Rye House (7.7 km north, 90.3% on time, 2.5% cancelled), which are the stations on its network closest to Cheshunt.
Within 30 km of here, Greater Anglia runs best at Lea Bridge, 15.2 km south (97.5%), and worst at Brimsdown, 5.3 km south (86.4%).
The busiest Greater Anglia station within 30 km of Cheshunt is London Liverpool Street, 20.9 km south, with about 603 scheduled stops a day.
Greater Anglia at Cheshunt has slipped a little, from 89.3% within three minutes in the previous 13 periods to 85.4% in the latest 13, a fall of 3.9 percentage points. Cancellations held steady at 2.5% of scheduled stops, against 2.5% before.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,728 | 85.4% | 2.7% |
| Period 6 of 2026-27 | 5,932 | 82.4% | 2.4% |
| Period 5 of 2026-27 | 5,937 | 80.4% | 4.5% |
| Period 4 of 2026-27 | 5,709 | 82.0% | 2.7% |
| Period 3 of 2026-27 | 5,974 | 82.5% | 3.2% |
| Period 2 of 2026-27 | 5,514 | 88.8% | 1.7% |
| Period 1 of 2026-27 | 6,844 | 89.4% | 2.8% |
| Period 13 of 2025-26 | 6,861 | 85.9% | 1.4% |
| Period 12 of 2025-26 | 6,176 | 85.5% | 3.2% |
| Period 11 of 2025-26 | 6,005 | 88.1% | 1.3% |
| Period 10 of 2025-26 | 5,383 | 90.1% | 1.4% |
| Period 9 of 2025-26 | 5,983 | 82.6% | 1.8% |
| Period 8 of 2025-26 | 5,851 | 86.9% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cheshunt
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 26,054 | 95.6% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out