Castle Bar Park
CBPLondonManaged by Great Western Railway
How this station is performing
Castle Bar Park has usable figures for 3 of the last 13 four-week periods to Period 7 of 2026-27, covering 20,207 scheduled stops, about 56 a day. In those periods 96.8% of stops arrived within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Castle Bar Park opened on 1 May 1904, 122 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hanwell is the oldest (1838) and South Greenford the newest (1926), with Castle Bar Park in between.
The nearest stations to Castle Bar Park are Drayton Green (0.7 km south), South Greenford (1.2 km north), West Ealing (1.3 km south-east), Hanwell (1.3 km south) and Ealing Broadway (2.3 km south-east). 59 stations lie within 10 km in all. Of the five, South Greenford is the most punctual at 97.3% and Ealing Broadway the least at 82.9%, with Castle Bar Park on 96.8%.
For Castle Bar Park, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 94.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 98.7%, which is 4.5 percentage points higher. Cancellations peaked at 9.6% of scheduled stops in Period 5 of 2026-27, against 4.3% over the latest 13 periods.
Great Western Railway is the only operator serving Castle Bar Park. Here it manages 96.8% within three minutes, 21.1 percentage points better than its 75.7% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,207 | 96.8% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Castle Bar Park? Delay Repay
These operators call at Castle Bar Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,536 | 94.2% | 7.5% |
| Period 6 of 2026-27 | 1,536 | – | 5.1% |
| Period 5 of 2026-27 | 1,534 | – | 9.6% |
| Period 4 of 2026-27 | 1,536 | – | 4.2% |
| Period 3 of 2026-27 | 1,535 | – | 4.6% |
| Period 2 of 2026-27 | 1,536 | – | 3.9% |
| Period 1 of 2026-27 | 1,792 | 98.7% | 3.4% |
| Period 13 of 2025-26 | 1,664 | – | 1.1% |
| Period 12 of 2025-26 | 1,536 | – | 2.1% |
| Period 11 of 2025-26 | 1,536 | – | 4.6% |
| Period 10 of 2025-26 | 1,394 | 98.5% | 3.7% |
| Period 9 of 2025-26 | 1,536 | – | 4.6% |
| Period 8 of 2025-26 | 1,536 | – | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out