Northern at Carlisle
How this operator is doing here
Northern had 38,348 scheduled stops at Carlisle in the 13 periods to Period 7 of 2026-27, 47% of the station's total. 86.7% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Carlisle also serve Dalston (Cumbria) (6.1 km south-west, 93.4% on time, 3.0% cancelled), Wetheral (6.5 km east, 78.6% on time, 3.6% cancelled), Armathwaite (13.7 km south-east, 77.7% on time, 1.0% cancelled), Brampton (Cumbria) (15.4 km east, 80.6% on time, 3.6% cancelled), Wigton (16.3 km south-west, 93.9% on time, 3.0% cancelled) and Lazonby and Kirkoswald (21.4 km south-east, 76.8% on time, 1.0% cancelled), which are the stations on its network closest to Carlisle.
Within 30 km of here, Northern runs best at Aspatria, 29.4 km south-west (94.6%), and worst at Langwathby, 27.8 km south-east (76.3%).
The busiest Northern station within 30 km of Carlisle is Wetheral, 6.5 km east, with about 39 scheduled stops a day.
Of the 6 operators with enough records at Carlisle, Northern is the most punctual, at 86.7%.
For Northern, Carlisle is the 84th best of 493 ranked stations. Its 86.7% here is 8.1 percentage points above the 78.6% across the whole network.
Cancellations of Northern at Carlisle are near its usual level: 2.6% of scheduled stops, against 2.8% across its network and 3.1% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,956 | 86.3% | 2.5% |
| Period 6 of 2026-27 | 2,956 | 90.6% | 1.9% |
| Period 5 of 2026-27 | 2,956 | 88.2% | 2.3% |
| Period 4 of 2026-27 | 2,956 | 87.9% | 1.8% |
| Period 3 of 2026-27 | 2,956 | 88.9% | 1.1% |
| Period 2 of 2026-27 | 2,951 | 86.5% | 2.7% |
| Period 1 of 2026-27 | 3,407 | 87.8% | 2.4% |
| Period 13 of 2025-26 | 3,219 | 86.7% | 2.6% |
| Period 12 of 2025-26 | 2,950 | 88.3% | 2.0% |
| Period 11 of 2025-26 | 2,853 | 86.8% | 3.0% |
| Period 10 of 2025-26 | 2,523 | 81.0% | 4.7% |
| Period 9 of 2025-26 | 2,806 | 82.1% | 3.8% |
| Period 8 of 2025-26 | 2,859 | 85.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carlisle
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 18,971 | 51.7% | 4.6% |
| TransPennine Express | 12,079 | 63.5% | 4.3% |
| ScotRail | 10,589 | 85.9% | 0.9% |
| Lumo (West Coast) | 815 | 55.4% | 4.7% |
| Caledonian Sleeper | 547 | – | – |
| LNER | 168 | 68.6% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out