Great Western Railway at Burnham (Buckinghamshire)
All trains at Burnham (Buckinghamshire)Great Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 673 scheduled stops at Burnham (Buckinghamshire) in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 57.4% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
Great Western Railway trains at Burnham (Buckinghamshire) also serve Taplow (2.4 km west, – on time, – cancelled), Slough (4.1 km east, 90.9% on time, 3.2% cancelled), Windsor and Eton Central (5.2 km south-east, 99.0% on time, 2.0% cancelled), Maidenhead (5.2 km west, 82.4% on time, 4.1% cancelled), Furze Platt (5.7 km west, 90.2% on time, 2.6% cancelled) and Cookham (6.4 km north-west, 88.6% on time, 2.6% cancelled), which are the stations on its network closest to Burnham (Buckinghamshire).
Within 30 km of here, Great Western Railway runs best at Windsor and Eton Central, 5.2 km south-east (99.0%), and worst at Reading, 23.6 km west (72.2%).
The busiest Great Western Railway station within 30 km of Burnham (Buckinghamshire) is Reading, 23.6 km west, with about 546 scheduled stops a day.
Of the 2 operators with enough records at Burnham (Buckinghamshire), Great Western Railway is the least punctual, at 57.4%.
Cancellations of Great Western Railway at Burnham (Buckinghamshire) are near its usual level: 3.4% of scheduled stops, against 4.0% across its network and 4.4% for every operator at the station.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 50 | – | – |
| Period 6 of 2026-27 | 52 | – | – |
| Period 5 of 2026-27 | 53 | – | – |
| Period 4 of 2026-27 | 47 | – | – |
| Period 3 of 2026-27 | 46 | – | – |
| Period 2 of 2026-27 | 50 | – | – |
| Period 1 of 2026-27 | 62 | 54.8% | 0.0% |
| Period 13 of 2025-26 | 57 | 63.6% | 3.5% |
| Period 12 of 2025-26 | 50 | – | – |
| Period 11 of 2025-26 | 53 | – | – |
| Period 10 of 2025-26 | 47 | – | – |
| Period 9 of 2025-26 | 50 | – | – |
| Period 8 of 2025-26 | 56 | 53.8% | 7.1% |
Other operators at Burnham (Buckinghamshire)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 51,509 | 85.9% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out