How this station is performing
Braystones has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 3,091 scheduled stops, about 8 a day. In those periods 65.4% of stops arrived within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
Braystones opened on 19 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Braystones is the oldest; the next oldest, Nethertown, dates from 1849.
The nearest stations to Braystones are Nethertown (2.4 km north-west), Sellafield (3.3 km south-east), Seascale (6.0 km south-east), St Bees (6.7 km north-west) and Drigg (9.4 km south-east). 5 stations lie within 10 km in all. At 65.4%, Braystones is less punctual than all of them; the best of the five, St Bees, manages 73.2%.
Braystones takes its name from a Village called Braystones, and the station stands 0.6 km from its centre.
Northern is the only operator serving Braystones. Here it manages 65.4% within three minutes, 13.2 percentage points worse than its 78.6% across its whole network.
Braystones is a quiet station, ranked 2541st for entries and exits in 2025-26, with about 1,096 of them. That is roughly 0 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 3,091 | 65.4% | 4.7% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 236 | – | 0.8% |
| Period 6 of 2026-27 | 236 | – | 3.4% |
| Period 5 of 2026-27 | 236 | – | 2.1% |
| Period 4 of 2026-27 | 236 | – | 3.4% |
| Period 3 of 2026-27 | 236 | – | 5.5% |
| Period 2 of 2026-27 | 236 | – | 3.0% |
| Period 1 of 2026-27 | 271 | – | 1.5% |
| Period 13 of 2025-26 | 259 | – | 5.4% |
| Period 12 of 2025-26 | 236 | – | 3.8% |
| Period 11 of 2025-26 | 236 | – | 5.9% |
| Period 10 of 2025-26 | 201 | – | 13.9% |
| Period 9 of 2025-26 | 236 | 70.3% | 8.1% |
| Period 8 of 2025-26 | 236 | 60.8% | 5.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out