Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Greater Anglia at Brandon

All trains at BrandonGreater Anglia across BritainEast of England

On time, last 13 periods77.0%Whole station: 76.5%
Cancelled1.0%Whole station: 1.1%
Scheduled stops12,284Of 12,670 at the station

How this operator is doing here

Greater Anglia had 12,284 scheduled stops at Brandon in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 77.0% of recorded arrivals came within three minutes and 1.0% of stops were cancelled.

Greater Anglia trains at Brandon also serve Lakenheath (6.2 km west, – on time, – cancelled), Thetford (9.1 km south-east, 77.1% on time, 1.0% cancelled), Shippea Hill (14.6 km west, – on time, – cancelled), Harling Road (19.3 km east, – on time, 1.0% cancelled), Kennett (21.6 km south-west, 89.8% on time, 1.6% cancelled) and Bury St Edmunds (23.1 km south, 85.9% on time, 1.0% cancelled), which are the stations on its network closest to Brandon.

Within 30 km of here, Greater Anglia runs best at Newmarket, 28.1 km south-west (89.9%), and worst at Soham, 24.1 km south-west (66.8%).

The busiest Greater Anglia station within 30 km of Brandon is Ely, 25.3 km west, with about 57 scheduled stops a day.

Of the 1 operators with enough records at Brandon, Greater Anglia is the most punctual, at 77.0%.

For Greater Anglia, Brandon is the 115th best of 122 ranked stations. Its 77.0% here is 13.3 percentage points below the 90.3% across the whole network.

Period by period

60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 88.5%Period 4 of 2025-26: 85.2%Period 5 of 2025-26: 86.7%Period 6 of 2025-26: 89.5%Period 7 of 2025-26: 82.6%Period 8 of 2025-26: 73.8%Period 9 of 2025-26: 79.1%Period 10 of 2025-26: 84.6%Period 11 of 2025-26: 85.2%Period 12 of 2025-26: 86.9%Period 13 of 2025-26: 84.1%Period 1 of 2026-27: 83.9%Period 2 of 2026-27: 81.2%Period 3 of 2026-27: 83.8%Period 4 of 2026-27: 79.5%Period 5 of 2026-27: 74.9%Period 6 of 2026-27: 51.2%Period 7 of 2026-27: 53.2%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 0.7%Period 2 of 2023-24: 0.0%Period 3 of 2023-24: 1.2%Period 4 of 2023-24: 0.9%Period 5 of 2023-24: 0.1%Period 6 of 2023-24: 0.1%Period 7 of 2023-24: 2.0%Period 8 of 2023-24: 2.3%Period 9 of 2023-24: 0.1%Period 10 of 2023-24: 1.1%Period 11 of 2023-24: 0.4%Period 12 of 2023-24: 4.4%Period 13 of 2023-24: 0.1%Period 1 of 2024-25: 0.5%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 1.4%Period 4 of 2024-25: 0.5%Period 5 of 2024-25: 0.3%Period 6 of 2024-25: 1.2%Period 7 of 2024-25: 1.7%Period 8 of 2024-25: 0.0%Period 9 of 2024-25: 0.5%Period 10 of 2024-25: 1.4%Period 11 of 2024-25: 0.5%Period 12 of 2024-25: 0.3%Period 13 of 2024-25: 0.0%Period 1 of 2025-26: 0.1%Period 2 of 2025-26: 0.9%Period 3 of 2025-26: 0.4%Period 4 of 2025-26: 0.7%Period 5 of 2025-26: 0.0%Period 6 of 2025-26: 0.5%Period 7 of 2025-26: 0.2%Period 8 of 2025-26: 0.8%Period 9 of 2025-26: 1.2%Period 10 of 2025-26: 0.3%Period 11 of 2025-26: 0.2%Period 12 of 2025-26: 1.9%Period 13 of 2025-26: 1.9%Period 1 of 2026-27: 1.0%Period 2 of 2026-27: 0.3%Period 3 of 2026-27: 0.5%Period 4 of 2026-27: 1.0%Period 5 of 2026-27: 1.2%Period 6 of 2026-27: 2.0%Period 7 of 2026-27: 0.6%2023-242024-252025-262026-27

See how Greater Anglia Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2789953.2%0.6%
Period 6 of 2026-271,05851.2%2.0%
Period 5 of 2026-271,01774.9%1.2%
Period 4 of 2026-2798279.5%1.0%
Period 3 of 2026-2799283.8%0.5%
Period 2 of 2026-2778481.2%0.3%
Period 1 of 2026-271,01383.9%1.0%
Period 13 of 2025-261,05784.1%1.9%
Period 12 of 2025-2698086.9%1.9%
Period 11 of 2025-2697985.2%0.2%
Period 10 of 2025-2685984.6%0.3%
Period 9 of 2025-2694779.1%1.2%
Period 8 of 2025-2671773.8%0.8%

Other operators at Brandon

OperatorScheduled stopsWithin 3 minCancelled
East Midlands Railway386––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out