Northern had 76,043 scheduled stops at Bolton in the 13 periods to Period 7 of 2026-27, 90% of the station's total. 60.8% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
Northern trains at Bolton also serve Moses Gate (2.5 km south-east, 52.6% on time, 3.5% cancelled), Hall-I'-Th'-Wood (2.8 km north, 67.4% on time, 3.2% cancelled), Farnworth (3.5 km south-east, 53.9% on time, 3.5% cancelled), Lostock (4.6 km west, 58.4% on time, 4.9% cancelled), Bromley Cross (Lancs) (4.6 km north, 69.5% on time, 3.2% cancelled) and Kearsley (Manchester) (4.6 km south-east, 54.3% on time, 3.6% cancelled), which are the stations on its network closest to Bolton.
Within 30 km of here, Northern runs best at Ryder Brow, 21.1 km south-east (92.5%), and worst at Moses Gate, 2.5 km south-east (52.6%).
The busiest Northern station within 30 km of Bolton is Manchester Piccadilly, 16.8 km south-east, with about 508 scheduled stops a day.
Northern at Bolton has slipped a little, from 64.6% within three minutes in the previous 13 periods to 60.8% in the latest 13, a fall of 3.8 percentage points. Cancellations fell to 3.5% of scheduled stops from 5.0%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,848 | 59.4% | 2.7% |
| Period 6 of 2026-27 | 5,846 | 63.4% | 2.1% |
| Period 5 of 2026-27 | 5,818 | 64.4% | 5.0% |
| Period 4 of 2026-27 | 5,692 | 61.1% | 4.4% |
| Period 3 of 2026-27 | 5,536 | 59.5% | 3.6% |
| Period 2 of 2026-27 | 5,859 | 61.6% | 3.0% |
| Period 1 of 2026-27 | 6,499 | 62.5% | 2.3% |
| Period 13 of 2025-26 | 6,378 | 64.0% | 6.4% |
| Period 12 of 2025-26 | 5,843 | 64.4% | 2.1% |
| Period 11 of 2025-26 | 5,813 | 64.0% | 1.8% |
| Period 10 of 2025-26 | 5,250 | 62.3% | 6.3% |
| Period 9 of 2025-26 | 5,827 | 46.8% | 3.8% |
| Period 8 of 2025-26 | 5,834 | 57.2% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bolton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 8,664 | 58.3% | 5.0% |