Bodorgan
BORWalesManaged by TfW Rail
How this station is performing
Bodorgan has usable figures for 5 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,712 scheduled stops, about 18 a day. In those periods 74.6% of stops arrived within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
The nearest stations to Bodorgan are Ty Croes (4.3 km north-west), Rhosneigr (6.9 km north-west), Valley (13.0 km north-west), Llanfairpwll (13.9 km east) and Holyhead (18.3 km north-west). 2 stations lie within 10 km in all. At 74.6%, Bodorgan is less punctual than all of them; the best of the five, Holyhead, manages 78.9%.
Bodorgan takes its name from a hamlet called Bodorgan, home to about 921 people, and the station stands 2.7 km from its centre.
For Bodorgan, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 62.9% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 85.3%, which is 22.4 percentage points higher. Cancellations peaked at 7.4% of scheduled stops in Period 9 of 2024-25, against 2.5% over the latest 13 periods.
Transport for Wales is the only operator serving Bodorgan. Here it manages 74.6% within three minutes, 10.4 percentage points worse than its 85.0% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 6,712 | 74.6% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Bodorgan? Delay Repay
These operators call at Bodorgan and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 527 | – | 2.7% |
| Period 6 of 2026-27 | 531 | – | 2.8% |
| Period 5 of 2026-27 | 481 | – | 3.7% |
| Period 4 of 2026-27 | 527 | – | 3.6% |
| Period 3 of 2026-27 | 539 | – | 2.6% |
| Period 2 of 2026-27 | 525 | – | 1.5% |
| Period 1 of 2026-27 | 579 | 75.6% | 1.0% |
| Period 13 of 2025-26 | 554 | 82.2% | 3.1% |
| Period 12 of 2025-26 | 504 | 85.3% | 1.8% |
| Period 11 of 2025-26 | 505 | – | 2.0% |
| Period 10 of 2025-26 | 453 | – | 2.6% |
| Period 9 of 2025-26 | 483 | 62.9% | 4.1% |
| Period 8 of 2025-26 | 504 | 65.1% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out